ANALISIS FAKTOR-FAKTOR PENYEBAB TERJADINYA REWORK PADA PROYEK PEMBANGUNAN HOTEL ZEST AMBON Siti Patimah Daeng Simamang; La Mohammat Saleh; Willem Gaspersz
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1593

Abstract

As a developing country, Indonesia cannot be separated from development and development in all fields, one of which is the construction and development of the construction business sector. The success of a project is largely determined by the good cooperation between the owner and the service provider. If the technical implementation is not good, it will have a bad impact on project performance, one of which is rework. The word rework in the Big Indonesian Dictionary is translated as rework or rework. Rework on construction projects is caused by errors in planning, wrong work procedures, and lack of supervision and can result in several losses, such as cost, time, and quality of work. This research was conducted by interviewing and distributing questionnaires to the construction project of Hotel Zest Ambon as many as 30 respondents. Respondents selected were implementers, supervisors, foremen, and workers. The questionnaires distributed were related to the factors causing the rework on the Zest Ambon Hotel construction project, which is located on Jl. Imam Bonjol, Kel Ahusen, Sirimau, Ambon City. Then the research results were processed using SPSS 26, using 4 methods of analysis, namely validity test, reliability test, descriptive analysis, and factor analysis to get the factors causing the rework and the dominant factors causing the rework. The results of the research show that there are three factors that cause rework, namely design and documentation factors with a mean value of 4.53, resource factors with a mean value of 4.37, and managerial factors with a mean value of 3.80. And the dominant factor is the design and documentation factor with Eigenvalues ​​> 1, which is 1.50.
ANALISIS FAKTOR-FAKTOR PENYEBAB TERJADINYA REWORK PADA PROYEK PEMBANGUNAN HOTEL ZEST AMBON Siti Patimah Daeng Simamang; La Mohammat Saleh; Willem Gaspersz
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1593

Abstract

As a developing country, Indonesia cannot be separated from development and development in all fields, one of which is the construction and development of the construction business sector. The success of a project is largely determined by the good cooperation between the owner and the service provider. If the technical implementation is not good, it will have a bad impact on project performance, one of which is rework. The word rework in the Big Indonesian Dictionary is translated as rework or rework. Rework on construction projects is caused by errors in planning, wrong work procedures, and lack of supervision and can result in several losses, such as cost, time, and quality of work. This research was conducted by interviewing and distributing questionnaires to the construction project of Hotel Zest Ambon as many as 30 respondents. Respondents selected were implementers, supervisors, foremen, and workers. The questionnaires distributed were related to the factors causing the rework on the Zest Ambon Hotel construction project, which is located on Jl. Imam Bonjol, Kel Ahusen, Sirimau, Ambon City. Then the research results were processed using SPSS 26, using 4 methods of analysis, namely validity test, reliability test, descriptive analysis, and factor analysis to get the factors causing the rework and the dominant factors causing the rework. The results of the research show that there are three factors that cause rework, namely design and documentation factors with a mean value of 4.53, resource factors with a mean value of 4.37, and managerial factors with a mean value of 3.80. And the dominant factor is the design and documentation factor with Eigenvalues ​​> 1, which is 1.50.
Implementasi Kesiapsiagaan Bencana Banjir Pada Siswa SMP Negeri 2 P.P Terselatan Delvia Rimesye Apalem; Rudi Serang; Willem Gaspersz
Jurnal Pengabdian Masyarakat Mandira Cendikia Vol. 3 No. 7 (2024)
Publisher : YAYASAN PENDIDIKAN MANDIRA CENDIKIA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Bencana banjir merupakan bencana alam yang sering terjadi yang di pengaruhi oleh curah hujan yang tinggi dan faktor lingkungan. Maluku merupakan salah satu daerah yang sering terjadi banjir dengan intensitas curah hujan 200mm yang di mulai bulan mei sampai bulan agustus. Hal ini menunjukkan perlu adanya pengetahuan tentang bencana dan pengurangan risiko bencana sejak dini pada anak untuk dapat memberikan pemahaman dan pengarahan langkah-langkah yang harus dilakukan saat terjadinya suatu ancaman bencana yang ada disekitar mereka selain itu untuk mengurangi korban. Kegiatan ini di laksanakan dengan metode ceramah dan simulasi.