Claim Missing Document
Check
Articles

Found 3 Documents
Search

PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN REVITALISASI DAN PENGEMBANGAN ASRAMA HAJI WAIHERU AMBON Tomabuji Talaohu; Tonny Sahusilawane; Maslan Abdin
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1679

Abstract

The revitalization and construction of the Waiheru Ambon hajj dormitory building, the method used in this research is the validation test, reliability test, f test and t test using the SPSS V16 tool where in this method the questionnaire data will be obtained which will then be analyzed with the SPSS V16 tool. The research results were obtained based on the results of data analysis that has been carried out to solve the problem in this research where when conducting research on project implementation such as column casting work, it is often found that the workforce is not effective and efficient when pressing the vibrator so that when dismantling the formwork you can see many columns. which is corroded, then obtained: 1) The positive influence between competence on labor productivity can be seen from the t-count of  5.149 > t-table 1.724 and sig value = 0.000 < 0.05 which means that competence is very influential in influencing labor productivity. 2) The positive effect between skills on labor productivity can be seen from the t-count of 3.732 > t table 1.724 and sig value = 0.001 < 0.05 which means that skills is very influential in influencing labor productivity. 3) The positive effect of work discipline on labor productivity can be seen from the t-count of 11.992 > t-table 1.724 and sig value = 0.000 < 0.05 which means that work discipline is very influential in influencing labor productivity. 4) The positive influence between the level of income on labor productivity can be seen from the t-count 3.968 > t-table 1.724 and sig value = 0.001 < 0.05 which means that the level of income is very influential in influencing labor productivity. 
EVALUASI KERUSAKAN DAN BIAYA PELAKSANAAN PERBAIKAN GEDUNG AUDITORIUM IAIN KOTA AMBON Yuni Kartika Akhmad; Tonny Sahusilawane; Maslan Abdin
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i1.1863

Abstract

This study aims to determine the level of damage that occurred in the repair of the Ambon City IAIN Auditorium Building and also to find out how much it costs to repair the Ambon City IAIN Auditorium Building. so that buildings can operate properly and users feel comfortable, which will further assist in improving building management. In carrying out the maintenance and maintenance of buildings, many things must be done so that the building has a high investment value, in general, the research specifically aims to be able to see the extent to which the implementation and management of building maintenance and maintenance. Damage to buildings occurs due to several factors including, human factors such as negligence in the implementation and use of materials, the quality of concrete factors of natural disasters such as earthquakes, floods, and the influence of weather and climate. For this reason, it is necessary to handle building maintenance where building maintenance is an activity to maintain the reliability, strength, and durability of buildings both in terms of infrastructure and facilities so that buildings are always fit to function as they should. The method used is observation and documentation. This technique is used to determine maintenance and care managers for buildings. From the results of the analysis carried out on the evaluation of repairs and implementation costs of the Ambon City IAIN Auditorium building, the level of damage that occurred to the building was 91% while the repair costs were IDR 49,327,557.66
Analisa Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Dinding Bata Ringan Proyek Pembangunan Sekolah Citra Kasih Ambon Ria Apriani Samal; Tonny Sahusilawane; Penina T. Istia
ULIL ALBAB : Jurnal Ilmiah Multidisiplin Vol. 3 No. 7: Juni 2024
Publisher : CV. Ulil Albab Corp

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56799/jim.v3i7.3871

Abstract

Dalam dunia jasa konstruksi, produktivitas tenaga kerja adalah salah satu faktor penentu keberhasilan sebuah proyek pembangunan. Tujuan dari penelitian ini adalah untuk mengetahui tingkat produktivitas tenaga kerja dan mengetahui pengaruh usia, pengalaman kerja dan upah terhadap tingkat produktivitas tenaga kerja proyek pembangunan Sekolah Citra Kasih Ambon. Dalam mengukur tingkat produktivitas tenaga kerja ada berbagai macam metode salah satunya metode work sampling dengan pendekatan productivity rating yaitu dengan meneliti besarnya tingkat (LUR) masing-masing pekerja pasangan dinding bata ringan. Penelitian ini dilakukan dengan cara mengamati tingkat produktivitas 4 orang tenaga kerja pada pekerjaan pasangan dinding bata ringan dari 20 orang tenaga dan disertai pengisian kuesioner. Pengamatan tingkat produktivitas (LUR) dilakukan selama 32 hari pada masing-masing pekerja. dari hasil pengumpulan data baik data produktivitas dan kuesionar dilakukan proses pengolahan data dengan bantuan komputer program SPSS (Statistical Package for Social Science) versi 26. Dari analisis data yang telah dilakukan dapat diketahui bahwa tingkat produktivitas (LUR) pekerja rata-rata pada pekerjaan pasangan dinding bata ringan proyek pembangunan Sekolah Citra Kasih Ambon sebesar 78,09 %, berarti cukup produktif karena lebih dari 50 %. sedangkan faktor-faktor yang mempengaruhi produktivitas tenaga kerja pada pekerjaan pasangan dinding bata ringan berdasarkan hasil analisis yaitu faktor usia, pengalaman kerja, dan upah.