Metode Pelaksanaan Pekerjaan Pondasi Bore Pile Pada proyek Gedung Baru Instalasi Pelayanan Utama Rumah Sakit Dr Saiful Anwar Malang Taurina Jemmy Irwanto; Nurul Lia Suryani; Bernessa Veda Ramdha; Abd Rahman; M. Anshori Nurul Ihsan
Jurnal Pengabdian Teknik dan Sains (JPTS) Vol 3, No 1 (2023): Januari 2023
Publisher : Lembaga Publikasi Ilmiah dan Penerbitan (LPIP)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30595/jpts.v3i01.16523

Abstract

The construction stage is a stage that needs attention so that the main goal of producing a quality project can be achieved. In the construction stage, project managers should consider the positive and negative aspects that will occur in the next stage, namely the operational stage. The contractor's profit will be obtained when it is appropriate to apply the construction method at the project site. Different construction methods must also differ in the needs of ny resources, waste generated, and almost certainly differ in the achievement of project objectives in terms of cost, quality, and time.In completing a project to achieve goals effectively and efficiently, a good management system is needed. To implement a good management system, various methods are needed according to the type of building completed. Management develops and directs methods to align resources and equipment use to achieve project objectives. Many factors affect the accuracy of equipment use and resource utilization including cost, time, and and social. To achieve the goal effectively and efficiently, construction management involves the stages of the standard method used in each building (house, building, etc.).
Pemanfaatan Limbah Industri Abu Batu Kapur dan Sekam Padi Sebagai Pengganti Sebagian Semen Terhadap Campuran Beton Tepat Mutu Aldi Setiawan; Nurul Lia Suryani; Sendika Renaldi; Alfita Yusriyah
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 1: March 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i1.7608

Abstract

With the rapid development on the island of Madura driven by increasing investments due to the impact of the Suramadu Bridge construction, there has also been a significant increase in the use of concrete. Given the growing demand for concrete, an innovation in utilizing local waste materials is necessary, aiming to influence the compressive strength of the concrete. In addition to utilizing local materials such as coarse aggregates from the Waru District in Pamekasan Regency, one of the waste materials that can be used is limestone powder from the Batumarmar District in Pamekasan Regency and rice husk ash from the Proppo District in Pamekasan Regency as a partial replacement for some concrete constituents. This study is a laboratory research aimed at obtaining a concrete mix formula. For the planned testing, concrete in the form of cylinders with dimensions of 15x30 cm is scheduled to be tested at the ages of 7 and 14 days for each mix variation. The study involves several concrete mix variations, namely, 5%, 10%, 15%, and 20% replacement of cement with limestone powder and rice husk ash. The compressive strength test results for the 14-day concrete age showed a consistent decrease in compressive strength with each addition of rice husk ash and limestone powder beyond the 5% replacement. The maximum compressive strength value was found in the 5% variation, with an average compressive strength of 285.41 kg/cm2 at the 7-day concrete age