PENGARUH VARIASI SUHU PENCAMPURAN DAN PEMADATAN AGREGAT BATU PECAH MADURA (DESA ASEM JARAN KECAMATAN BANYUATES KABUPATEN SAMPANG) PADA CAMPURAN ASPAL PANAS (HOTMIX) ASPHALT CONCRETE WEARING COURSE (ACWC), TERHADAP KARAKTERISTIK MARSHALL Taurina Jemmy Irwanto
JURNAL PILAR TEKNOLOGI Jurnal Ilmiah Ilmu Ilmu Teknik Vol. 4 No. 1 (2019): Jurnal Pilar Teknologi
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v4i1.19

Abstract

 AbstractThe mixing temperature has a role in the asphalt smelting process against aggregate, while the compaction temperature has a depth in the density level of the hot asphalt mixture. The better the mixing and compaction process, the better the mixing and compaction process, the better the performance of the asphalt mixture, the better the performance of the asphalt mixture, the better the paved mixture is planned according to the general specifications of Bina Marga 2010. The mixture of mixtures used is Concrete Wearing Course (ACWC). In this study aims to determine the effect of variations in mixing temperature and compaction on the mixture ACWC hot asphalt using broken stone Asem Jaran Distric Banyuates Sampang. Temperature variations used are 160/1460C, 170/1560C, 180/1660C ,  190/1760C  and  200/1860C  with asphalt content 5,2%, 5,7% dan 6,2%. The test uses the Marshall test method by looking for the charcteristic values of Marshall. Based on the results of testing in the laboratory, it was found an increase in the value of Marshall characteristics from variations in temperature 160/1460C to 170/1560C temperature variations and to decrease the test result of Marshall characteristics values at a temperature variation of 180/1660C ,  190/1760C and 200/1860C so that it was concluded that the use of mixing temperature and optimum compaction at a temperature variation of 170/1560C. Keywords: Temperature, Temperature Variation, Marshall Test, Asphalt concrete Wearing Course (ACWC).  
Perbandingan Karakteristik Marshall Aspal Karet (Natural Rubber Modified Asphalt) Dan Aspal Penetrasi 60/70 Pada Campuran Asphalt Concrete - Wearing Course (AC-WC) Menggunakan Aggregat Lokal Madura Taurina Jemmy Irwanto; Nurul Lia Suryani; Sendika Renaldi
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5168

Abstract

Road damage in Indonesia is generally caused by excessive loading. One type of hot asphalt that receives the load directly from the vehicle is AC-WC (Asphalt Concrete - Wearing Course), ACWC. to hot mix asphalt and to reduce production costs and asphalt layer strength. natural rubber asphalt mixture for road asphalt can increase asphalt pavement in terms of service life and resistance to grooves, asphalt has a better pavement level, is not easy to leave wheel tracks when asphalt is wet, and has higher durability than ordinary asphalt. This will determine the longevity of the pavement. Based on this explanation, the use of local materials is expected to reduce production costs and reduce the traffic load of the road network that has been passed to transport materials from outside the island of Madura. In this further research, we will study the comparison of the use of Natural Rubber Modified Asphalt and 60/70 penetration asphalt using Madura local aggregates against the AC-WC hot asphalt mixture, which is expected to produce hot asphalt mixtures made from local and natural materials so that they have strength. the good one. From the test results on all types of mixtures, the optimal mixture was obtained at 4.9% asphalt content with the highest stability value of 1040 kg with a VIM value of 4.43%, VMA 15.91%, VFB 72.12%, MQ 300Kg/mm, and the density value is 2.252 gr/cc.
Pemanfaatan Limbah Konstruksi untuk Timbunan Jalan Desa di Dsn. Nglundo Kecamatan Sukomoro Kabupaten Nganjuk Taurina Jemmy Irwanto; Angga Bagus Setya Sali; Khosnol Khotimah
Jurnal Pengabdian Teknik dan Sains (JPTS) Vol 2, No 1 (2022): Januari 2022
Publisher : Lembaga Publikasi Ilmiah dan Penerbitan (LPIP)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30595/jpts.v2i01.13100

Abstract

Pengabdian ini mengkaji tentang pemanfaatan limbah konstruksi yang dihasilkan dari proyek pembangunan untuk timbunan jalan yang ada di di Dusun Nglundo Kecamatan Sukorejo Kabupaten Nganjuk. Pengabdian ini menggunakan pengabdian aplikatif yakni pengabdian yang didasarkan pada telaah kepustakaan yang dijabarkan melalui deskripsi menggunaakan sumber kepustakaan seperti buku, jurnal serta peraturan perundang undangan yang berkaitan dengan topik pengabdian. Pada pengabdian ini dijelaskan di Dusun Nglundo memiliki banyak aktivitas konstruksi yang menimbulkan berbagai jenis limbah dari hasil proses konstruksi yang dilakukan. Oleh karena itu, perlu adanya pemanfaatan limbah konstruksi yang dihasilkan untuk kepentingan masyarakat. Salah satunya adalah untuk timbunan jalan yang ada di desa sebab bahan material berlebih seperti pasir dan batu sangat bermanfaat untuk aktivitas ini. Tujuan utama jalan merupakan prasarana yang menghubungkan antar wilayah di desa. Selain itu melalui pemanfaatan limbah ini masyarakat dapat mengembangkan wilayahnya serta turut andil dalam menjaga kelestaria lingkungan.
Metode Pelaksanaan Pekerjaan Pondasi Bore Pile Pada proyek Gedung Baru Instalasi Pelayanan Utama Rumah Sakit Dr Saiful Anwar Malang Taurina Jemmy Irwanto; Nurul Lia Suryani; Bernessa Veda Ramdha; Abd Rahman; M. Anshori Nurul Ihsan
Jurnal Pengabdian Teknik dan Sains (JPTS) Vol 3, No 1 (2023): Januari 2023
Publisher : Lembaga Publikasi Ilmiah dan Penerbitan (LPIP)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30595/jpts.v3i01.16523

Abstract

The construction stage is a stage that needs attention so that the main goal of producing a quality project can be achieved. In the construction stage, project managers should consider the positive and negative aspects that will occur in the next stage, namely the operational stage. The contractor's profit will be obtained when it is appropriate to apply the construction method at the project site. Different construction methods must also differ in the needs of ny resources, waste generated, and almost certainly differ in the achievement of project objectives in terms of cost, quality, and time.In completing a project to achieve goals effectively and efficiently, a good management system is needed. To implement a good management system, various methods are needed according to the type of building completed. Management develops and directs methods to align resources and equipment use to achieve project objectives. Many factors affect the accuracy of equipment use and resource utilization including cost, time, and and social. To achieve the goal effectively and efficiently, construction management involves the stages of the standard method used in each building (house, building, etc.).