Claim Missing Document
Check
Articles

Found 2 Documents
Search

WORKSHOP PENYUSUNAN BUSINESS PLAN PADA PONDOK PESANTREN ROJAUL HUDA YPI DARUN NASYA BANDUNG BARAT Ismawati, Linna; Rukhviyanti, Novi; Putra, Kurniawan; Charisma Sasmita, Bella
JURNAL PENGABDIAN KEPADA MASYARAKAT (ADI DHARMA) Vol 1 No 2 (2023): JURNAL PENGABDIAN KEPADA MASYARAKAT (ADI DHARMA)
Publisher : ABISATYA DINAMIKA ISWARA PUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (475.824 KB) | DOI: 10.58268/adidharma.v2i1.35

Abstract

Darun Nasya Islamic Boarding School organizes Islam religious education supported by modern learning programs that equip students to have soft skills and hard skills in order to prepare students to enter the community. Darun Nasya provides entrepreneurial knowledge through implementation in the Saung Pondok Barokah Umat's business unit. The students participate in the management and development of the business unit as a means of entrepreneurial practice. The obstacles faced by Darun gas stations are learning media and business management knowledge that are still minimal, as well as difficulties developing business due to limited funds. Based on these problems, it is necessary to increase soft skill capacity through business plan preparation workshops so that Darun Nasya can develop its business units. Business Plan is a clear plan in running a business. Various benefits of preparing a Business Plan include clarity of business strategies and market opportunities, making business ideas and priorities, helping capital, and providing business information to investors and consumers. The implementation of a Business Plan preparation workshop can improve the skills of students in entrepreneurship.
Analysis of Fuel Usage in Biogas Power Plant at PT. Berkat Sawit Sukamaju Palembang Putra, Kurniawan; ., Rahmaniar; Dalimunthe, Muhammad Erpandi
Power Elektronik : Jurnal Orang Elektro Vol 14, No 2 (2025): POWER ELEKTRONIK
Publisher : Politeknik Harapan Bersama Tegal

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30591/polektro.v14i2.9491

Abstract

PT Berkat Sawit Sukamaju is an oil palm processing plant with a capacity of 45 tonnes/hour which requires electrical energy in processing FFB into CPO, so far the energy used comes from diesel and steam power plants. However, problems arise when the price of industrial diesel as diesel fuel increases and the selling value of shells as biomass turbine fuel increases, therefore PT. Berkat Sawit Sukamaju built a biogas power plant with a capacity of 3x1 MW. Biogas power plant (PLTBg) is a power plant that is fuelled by methane gas from liquid waste / POME factory, but it is necessary to know the efficiency of the use of methane gas fuel used whether it is effective or not so that the energy produced can be optimal. This study was conducted to analyse the use of fuel in the biogas power plant at PT Berkat Sawit Sukamaju so that the efficiency of fuel use and the economic value of the company after the biogas plant operates can be known. Using the quantitative method, it can be seen that the fuel efficiency is 40.09% and PT. Berkat Sawit Sukamaju gets a profit of Rp. 295,760,320 / month from saving the use of shells and diesel.