TIME PERFORMANCE ANALYSIS ON THE CONSTRUCTION PROJECT OF SUBALI BRIDGE IN SUTOJAYAN DISTRICT (D.G.008), BLITAR REGENCY, USING THE EARNED VALUE METHODOLOGY APPROACH Setyawan, Dhimas Triadi; Oetomo, Wateno; Marleno, Risma
JOURNAL OF HUMANITIES, SOCIAL SCIENCES AND BUSINESS Vol. 3 No. 2 (2024): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/jhssb.v3i2.1041

Abstract

One of the project types is the Construction Project. The main activity components of this type of project consist of feasibility assessment, engineering design, procurement and construction. In construction projects very often delays occur where the realization in the field does not match the schedule of the implementation plan, due to several factors that occur, even though a careful plan has been prepared but in practice in the field there are still many problems in implementation. The purpose of this study was to determine the performance of time in the implementation that took place from week -1 to week 17 on the Subali Bridge Construction project, Sutojayan Kec. (D.G.008), Blitar Regency using Earned Value. From the results of the analysis it can be seen that the costs incurred are lower than the planned costs, this can be seen in the CPI value of 1.28 while the implementation time is slower than the planned schedule indicated by the SPI value of 0.71.