Claim Missing Document
Check
Articles

Found 3 Documents
Search

Project Management on Network and Security Development using the PMBOK Method Iqbal, Aldy Mercyano; Setiadi, Indra Tresna; Samidi, Samidi
Jurnal Sisfokom (Sistem Informasi dan Komputer) Vol 13, No 2 (2024): JULY
Publisher : ISB Atma Luhur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32736/sisfokom.v13i2.2131

Abstract

HOSPITAL ABC is one of the companies that operates in the healthcare sector. In the construction of the hospitals, must be supported by the implementation of technology, especially network technology so that all operational devices in the hospital can be connected and communicate with each other, while still paying attention to the security factor on the network. Based on this, project management is needed in network and security development at the hospital to be built so that the development can be following the timeline and meet the expectations of all stakeholders. With the use of the PMBOK approach for network development and security in hospitals, every phase has very important activities and is related to other activities. Besides that, by using the PMBOK approach can also find out which parts are challenges in project implementation. In this project, the process of procuring/ordering devices, storing devices, and physically checking devices with BAST are critical parts and require more attention so that the project can run according to the specified time.
Stock Price Prediction of PT. Kimia Farma, Tbk Using Bayesian Ridge Algorithm Iqbal, Aldy Mercyano; Setiadi, Indra Tresna; Pratama, Aditya Dhian; Imelda, Imelda
Al Qalam: Jurnal Ilmiah Keagamaan dan Kemasyarakatan Vol. 17, No 3 : Al Qalam (Mei 2023)
Publisher : Sekolah Tinggi Ilmu Al-Qur'an (STIQ) Amuntai Kalimantan Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35931/aq.v17i3.2222

Abstract

Stocks are proof of ownership of capital/funds in the company, a paper that clearly states the nominal value, and company name and is followed by an explanation of the rights and obligations to each shareholder, enough shares to be sold. Many companies from various sectors market their shares, one of which is PT. Kimia Farma, Tbk. This study aims to determine the performance of the Bayesian Ridge Regression algorithm to predict the closing price of PT Kimia Farma, Tbk's stock price. The data for these stocks was collected through the website id.investing.com with a data period of 2015 - 2022. Based on the test results, the Bayesian Ridge Regression algorithm can be used to predict stock prices with a good value where the R2 value is 0.9968 and RMSE value of 49.199 when modelling, R2 value is 0.9972 and RSME value is 45.400 when testing with new/testing data.
Project Management on Network and Security Development using the PMBOK Method Iqbal, Aldy Mercyano; Setiadi, Indra Tresna; Samidi, Samidi
Jurnal Sisfokom (Sistem Informasi dan Komputer) Vol. 13 No. 2 (2024): JULY
Publisher : ISB Atma Luhur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32736/sisfokom.v13i2.2131

Abstract

HOSPITAL ABC is one of the companies that operates in the healthcare sector. In the construction of the hospitals, must be supported by the implementation of technology, especially network technology so that all operational devices in the hospital can be connected and communicate with each other, while still paying attention to the security factor on the network. Based on this, project management is needed in network and security development at the hospital to be built so that the development can be following the timeline and meet the expectations of all stakeholders. With the use of the PMBOK approach for network development and security in hospitals, every phase has very important activities and is related to other activities. Besides that, by using the PMBOK approach can also find out which parts are challenges in project implementation. In this project, the process of procuring/ordering devices, storing devices, and physically checking devices with BAST are critical parts and require more attention so that the project can run according to the specified time.