Irianto, Muhamad Alamsyah
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

AutoCAD® 2D for Geometric Design of Terbanggi Besar–Pematang Panggang Highway (Sta.28+650 – Sta.53+650) Gunawan, Ratih Yuliani; Rifai, Andri Irfan; Irianto, Muhamad Alamsyah
Citizen : Jurnal Ilmiah Multidisiplin Indonesia Vol. 2 (2022): SPECIAL ISSUE: Sustainability of Design, Public Transport, & Engineering
Publisher : DAS Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53866/jimi.v2i5.189

Abstract

With a length of approximately 2,818 kilometers, the Trans Sumatra Highway connects cities from Lampung to Aceh. Meticulous planning and adherence to the geometric and technical requirements of the route are required to provide good road service. The purpose of this paper is to specifically redesign the current route on the Terbanggi Besar-Pematang Panggang section of the highway. The information used in this report as a guide for re-planning came from the results of field surveys. The geometric design of this highway was carried out using the manual calculation method based on the Road Design Standards of Indonesia 2021 and visualized using AutoCAD® 2D. Based on available data, a design speed (VD) of 120 kph is determined according to the maximum value on flat terrain on the highway. As a result of data processing on a particular road section, a horizontal alignment with a full circle curve type with a radius of 1500 m was created. Meanwhile, a sag vertical curve type is obtained in the vertical alignment with a length value at one point of the curve (L) of 75.6 m