Strategic Applications for Construction Management Enhancement Waheed, Muhammad; Mutahir Abbas
JOURNAL OF DIGITAL LEARNING AND DISTANCE EDUCATION Vol. 2 No. 5 (2023): Journal of Digital Learning and Distance Education (JDLDE)
Publisher : RADINKA JAYA UTAMA PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56778/jdlde.v2i4.165

Abstract

This software application brings new ideas in the development of applications and helps small businesses complete the business process on time. It is designed to monitor applications, work management, problem lists, and transfer of work or information by electronic means, which is very important in Android, iOS and PC mode. Special applications provide users with useful functions such as receiving instructions from the web, sending explanations, storing work-related information, etc. This client work includes office-to-employee and employee-to-employer relationships. The ultimate goal of the app is to be a bridge between employees and employers for monitoring, updating, monitoring and optimization. Discussion and explanation of a successful application can play an important role in developing it.
ELEMENTS OF COST AND SCHEDULE OVERRUN IN CONSTRUCTIONPROJECTS WAHEED, MUHAMMAD
Indonesian Journal of Engineering Research Vol 4 No 2 (2023): Indonesian Journal of Engineering Research
Publisher : Future Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11594/ijer.v4i2.46

Abstract

The cost of a basic upgrade to this wonderful piece of study is typically expressed in necessary units like earned dollars. The economic activity necessary to ensure that the building projects are sufficiently finished within an approved budget is properly included in the Project Cost. Although having more practical experience in construction management, cost and schedule overruns still play a significant role in many projects. Modern literatures are studied back-to-back and divided into two parts, which costs money for particular projects, overrunning of schedules in construction projects. The main study establishes that price increase causes cost and schedule overruns. For all intents and purposes, any client who is interested in facilities in the manufacturing sector is complete in terms of scope, timing, and cost. These studies have been published under a creative commons permission with the express purpose of carefully controlling causes. Uniquely required, necessary materials and cutting-edge products have a direct impact on building projects' schedule and expense overruns. The published study clearly shows the lack of essential maintenance of the project equipment, decreased working class productivity, barriers in bill declaration, poor preservation of the useful tools, and other external factors slowly constitute the significant factors that may properly conduct the project at a typical cost over the period.
Innovative Technologies in Construction Project Management for Performance Improvement Waheed, Muhammad
International Journal of Science, Engineering, and Information Technology Vol 8, No 1 (2023): IJSEIT Volume 08 Issue 01 31 December 2023
Publisher : Universitas Trunojoyo Madura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21107/ijseit.v8i1.23044

Abstract

Construction delays are becoming the most important issue facing all organizations in the construction industry. The majority of building projects in Pakistan are dealing with a similar issue. The goals of the organizations involved in construction firms, including the client, contractor, consultant, management, and others, are to finish the work within the allotted time frame, within the allocated funds, and with high-quality results. Construction projects are heavily influenced by delays; if individuals are unaware of the reasons behind the delays, they will not be successful. The purpose of this study is to identify the causes that cause delays so that the organizations can enhance the project's success. To determine the duration issues, the construction group members—owners, contractors, consultants, engineers, etc.—are surveyed using a questionnaire.
The Role of Roadside Tree Planting in Environmental Conservation Waheed, Muhammad; Zunaira Naeem
RADINKA JOURNAL OF SCIENCE AND SYSTEMATIC LITERATURE REVIEW Vol. 2 No. 1 (2024): Radinka Journal of Science and Systematic Literature Review (RJSLR)
Publisher : RADINKA JAYA UTAMA PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56778/rjslr.v2i1.213

Abstract

Roadside tree planting refers to the practice of planting trees along roadsides and highways. It serves multiple purposes, including enhancing the aesthetic appeal of the landscape, providing shade, reducing erosion, improving air quality, and creating wildlife habitats. These trees can also act as windbreaks, reducing the impact of strong winds on vehicles and nearby properties. Moreover, they contribute to mitigating the urban heat island effect by providing cooling shade and reducing surface temperatures. Additionally, roadside tree planting can help in carbon sequestration, as trees absorb carbon dioxide from the atmosphere during photosynthesis. Overall, it's a sustainable practice with numerous environmental, social, and economic benefits.
Enhancing organizational efficiency and quality control through the implementation of total quality management: A strategic approach to sustainable improvement Waheed, Muhammad; Abbas, Mutahir
Journal of Commerce, Management, and Tourism Studies Vol. 3 No. 2 (2024): Aug 2024
Publisher : YAYASAN MITRA PERSADA NUSANTARA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58881/jcmts.v3i2.35

Abstract

This study explores the strategic implementation of Total Quality Management (TQM) as a means to enhance organizational efficiency and strengthen quality control mechanisms. In an increasingly competitive business environment, organizations must adapt to quality-centric frameworks that not only improve operational performance but also ensure long-term customer satisfaction and sustainability. The primary aim of this research is to assess how the principles and practices of TQM contribute to increased efficiency, process optimization, and quality assurance across various organizational levels. A qualitative-descriptive method was employed, involving a combination of case study analysis and semi-structured interviews with quality managers from three manufacturing firms actively implementing TQM practices. Key components analysed include continuous improvement (Kaizen), customer focus, employee involvement, process standardization, and top management commitment. Data were coded and thematically analysed to identify recurring patterns and strategic outcomes of TQM application. The findings reveal that the successful implementation of TQM results in measurable improvements in productivity, defect reduction, cost efficiency, and employee morale. Firms that consistently applied quality control tools such as Six Sigma, PDCA cycles, and root cause analysis reported enhanced decision-making and better responsiveness to customer demands. The role of leadership and internal communication was also identified as a critical success factor in embedding quality culture. In conclusion, this study affirms that TQM is not merely a set of tools but a holistic organizational philosophy that, when implemented effectively, leads to sustainable competitive advantage. The research recommends continuous training, inclusive leadership, and clear performance metrics as key enablers for optimizing TQM outcomes.
Just-In-Time Importance in the Construction Industry Waheed, Muhammad; Mutahir Abbas; Aftab Hameed Memon
AMPLITUDO : Journal of Science and Technology Innovation Vol. 4 No. 2 (2025): August
Publisher : Balai Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56566/amplitudo.v4i2.318

Abstract

The Pakistani construction industry has gained a reputation as being both highly competitive and dynamic in recent years. The construction sector has been seeking to apply cutting-edge business strategies to survive in the increasingly competitive market. Organizations must try to offer clients high-quality, inexpensive products that do so in the shortest length of time. This is where creative concepts like Just-In-Time, which emphasize cost reduction by reducing non-value-added processes, come into action. This study evaluates the JIT method compared to the traditional approach to material management, identifies the advantages and disadvantages of the JIT method through a questionnaire survey, and assesses the significance of the JIT method in the construction of multistory buildings.
The Key Barrier to Digital Transformation in Pakistan's Construction Sector Waheed, Muhammad; Abbas, Mutahir
International Journal of Economic, Finance and Business Statistics Vol. 1 No. 2 (2023): Desember 2023
Publisher : MultiTech Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59890/ijefbs.v1i2.980

Abstract

Digitalization has become a global trend and the Pakistani construction industry is no exception. Digitalization has faced many challenges over the years. The objective of this study is to uncover the obstacles preventing the adoption of digitalization within the Pakistani construction industry. Additionally, it aims to analyze the advantages that digitalization offers in enhancing productivity within this sector. The results show that the main barriers to digitalization are barriers related to the use of technology, the high cost of technology, lack of energy, ease of replacement, and unavailability of digital equipment. Stakeholders' awareness of the benefits of digitalization needs to be increased.
The Risk Management and Value Engineering: Mitigating Challenges in Construction Waheed, Muhammad
International Journal of Economic, Finance and Business Statistics Vol. 2 No. 1 (2024): February 2024
Publisher : MultiTech Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59890/ijefbs.v2i1.1379

Abstract

Value Engineering is a management technique crucial in construction for enhancing value and reducing costs. Unlike mere cost cutting, Value Engineering aims to improve functionality by minimizing energy consumption in terms of manpower, materials, and machines. Multidisciplinary teams of engineers, influencing the design process, enhance Value Engineering benefits. It's highly effective in identifying and eliminating unnecessary costs across building design, construction, operations, and maintenance. Value Engineering involves three main stages: Pre-Study, Job Plan, and Post-Study. This literature review delves into how Value Engineering principles are applied in building projects to achieve superior quality at lower costs.