Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Distribusi Aliran pada Pipa Distribusi Sistem Irigasi Tetes di Kampung Glintung (GWS) Kota Malang Kurniasari, Marisa Wahyu; Sedyowati, Laksni; Wibisono, Gunawan
Composite: Journal of Civil Engineering Vol 3, No 1 (2024): Juni 2024
Publisher : University of Merdeka Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26905/cjce.v3i1.12925

Abstract

Dalam upaya menjaga kelangsungan produksi pangan, Kampung Glintung Water Street (GWS) menerapkan sistem irigasi tetes pada tanaman melon. Sistem irigasi tetes merupakan suatu cara penyaluran air dari pipa utama melalui emitter atau penetes yang didistribusikan melalui aliran dalam jaringan perpipaan. Kebutuhan air tanaman melon untuk irigasi tetes sekitar 1-2 liter/hari per tanaman. Tujuan dari penelitian ini adalah untuk menganalisis distribusi aliran pada 15 titik pipa irigasi tetes untuk mencapai debit aliran yang diinginkan, yakni 30 liter per hari. Metode yang digunakan adalah metode kuantitatif eksperimental, dengan data primer meliputi kecepatan aliran, debit aliran irigasi, dan keseragaman tetesan. Hasil penelitian menunjukkan distribusi aliran di 15 titik pipa irigasi tetes memenuhi debit aliran yang diinginkan, yakni 30 liter per hari. Distribusi debit aliran pada setiap titik irigasi berbeda-beda. Keseragaman distribusi air menunjukkan perbedaan kriteria keseragaman di setiap titik irigasi, dengan keseragaman rata-rata 91,78%.
Analisis Value Engineering untuk Penghematan Biaya Pekerjaan Arsitektur pada Proyek Apartemen X Tangerang Selatan Ramadhan, Muhammad Mahesa; Kurniasari, Marisa Wahyu
Jurnal Teknik Sipil Vol 20 No 2 (2024): Jurnal Teknik Sipil
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jts.v20i2.6202

Abstract

The demand for housing among the population is substantial, leading to the challenge of insufficient land area for construction. We construct residential developments horizontally to address this issue. However, the construction costs associated with this approach are significantly higher. As a result, there is a need for various efforts to optimize construction costs, and one such initiative involves the application of value engineering methods. The X Apartment Project in South Tangerang, with a construction value of Rp. 203,204,569,971, is the focus of this study. Based on the significant value of the development, this study seeks to estimate cost savings through value engineering analysis, particularly in the area of architectural work. This research method has four stages, namely the information stage, the speculation stage, the analysis stage, and the presentation stage. The observations lasted one month and were conducted using a questionnaire instrument. The Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method provides an alternative decision-making system. This study demonstrates that the application of value engineering reduced the initial cost of Rp. 203,204,569,971 to Rp. 201,685,400,449, with a reduction of 0.75% in window work (J1), glass door work (PL1), door work (PD1), light brick wall work, and homogenous tile KR2B floor tile work.