p-Index From 2021 - 2026
0.444
P-Index
This Author published in this journals
All Journal Daktilitas
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PENGARUH KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA PROYEK PEMBANGUNAN RSUD CAMPURDARAT Almizan Dicky Kurniawan; Yuris Permana Yoga Utama
JURNAL DAKTILITAS Vol. 2 No. 1 (2022): JUNI 2022
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v2i1.569

Abstract

Abstract Occupational safety and health (K3) factors are very influential on the performance of a project, so they must be considered seriously. Ignoring these factors has proven to result in a high rate of work accidents on construction projects. This will increase labor insurance costs and affect project performance. Therefore, when carrying out construction work, it is required to implement an occupational safety and health (K3) system. This study aims to determine the effect of occupational safety and health (K3) on the performance of construction workers in the construction project of the Campurdarat Hospital. The stage of this research is the study of various existing literatures to determine the variables to be used. The next stage is to collect data by direct interviews and using the Simple Random Sampling method. To determine the effect of occupational safety and health (K3) on the performance of construction workers, multiple linear regression analysis was used including validity & reliability tests, classical assumption test (multicollinearity, autocorrelation normality, heteroscedasticity) regression test (f & t test). The results of this study indicate that the independent variables Occupational Health and Safety (X1) and Occupational Health (X2) on K3 problems simultaneously and partially have a significant and positive effect on the variable performance of construction workers in the construction project of the Campurdarat Hospital, where the influence of the X1 variable is 1,309 ( 54.38%) and X2 of 1,098 (45.62%). This study also shows that the Occupational Safety variable (X1) has a dominant effect compared to the Occupational Health variable (X2). Keyword: Occupational safety and health (K3), work accidents, the construction project, construction workers. Abstrak Faktor – faktor keselamatan dan kesehatan kerja (K3) sangat berpengaruh terhadap kinerja dari sebuah proyek, sehingga harus diperhatikan dengan sungguh – sungguh. Pengabaian faktor tersebut terbukti mengakibatkan tingginya tingkat kecelakaan kerja pada proyek konstruksi. Sehingga akan menambah biaya asuransi tenaga kerja dan mempengaruhi kinerja proyek. Oleh karena itu, saat pelaksanaan pekerjaan konstruksi diwajibkan untuk menerapkan sistem keselamatan dan kesehatan kerja (K3). Penelitian ini bertujuan untuk mengetahui pengaruh faktor keselamatan dan kesehatan kerja (K3) terhadap kinerja pekerja konstruksi pada proyek pembangunan RSUD Campurdarat. Tahapan penelitian ini adalah studi berbagai literatur yang ada untuk menentukan variabel yang akan digunakan. Tahap selanjutnya melakukan pengambilan data dengan cara wawancara langsung dan dengan metode Simple Random Sampling. Untuk mengetahui pengaruh keselamatan dan kesehatan kerja (K3) terhadap kinerja pekerja konstruksi digunakan analisis regresi linear berganda meluputi uji validitas & realibilitas, uji asumsi klasik (multikolinieritas, normalitas autokorelasi, heterokedasitas) uji regresi ( uji f & t ). Hasil dari penelitian ini menunjukkan bahwa variabel bebas Kesehatan Kerja Keselamatan Kerja (X1) dan Kesehatan Kerja (X2) terhadap masalah K3 secara simultan dan parsial berpengaruh signifikan dan positif terhadap variabel kinerja pekerja konstruksi pada proyek pembangunan RSUD Campurdarat, dimana pengaruh variabel X1 sebesar 1,309 (54,38%) dan X2 sebesar 1,098 (45,62%). Pada penelitian ini juga menunjukkan bahwa variabel Keselamatan Kerja (X1) berpengaruh dominan dibandingkan variable Kesehatan Kerja (X2). Kata kunci: Keselamatan dan Kesehatan Kerja (K3), kecelakaan kerja, proyek konstruksi, pekerja konstruksi.
PENINGKATAN TATA LETAK PERSIMPANGAN BERSINYAL MELALUI ANALISIS PANJANG ANTRIAN DENGAN PENGURANGAN LATENSI (STUDI KASUS: JALAN RAYA BOYOLANGU-JALAN MOH.YAMIN-JALAN RAYA PUCUNG KIDUL) DANANG WIJANARKO; ALMIZAN DICKY KURNIAWAN
JURNAL DAKTILITAS Vol. 3 No. 2 (2023): DESEMBER 2023
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v3i2.959

Abstract

ABSTRACT Rapid urban development requires monitoring and evaluation of intersection conditions, especially inurban areas where space availability is very limited. As a result, traffic handling becomes very important, soknowledge of the volume and capacity characteristics of road segments is essential. The correlation acomparison of the intersection's wait time and queue length, along Considering the assessment of theintersection's operating effectiveness under investigation. original information collected from field surveys atthe intersection of Jalan Raya Boyolangu. The main source of this data collection is the Jalan Raya Moh. Yamin- Jalan Raya Pucung Kidul intersection. In addition, supplementary materials for this study were derived fromcalculations and hypotheses contained in literature books. A week-long traffic volume survey gatheredinformation for data analysis. The Highway Capacity Manual (HCM) 1985 and Ideas contained in theIndonesian Road Capacity Manual (MKJI) 1997 were used to ascertain the queue value, latency, length, as wellas the level of intersection approach saturation. Drawing from the outcomes in the domain, the degree ofsaturation values on Jalan Raya Boyolangu, Jalan Moh. Yamin, and Jalan Raya Pucung Kidul are 0.68, 0.288,and 1.144. This demonstrates how poorly the road is maintained because the waiting time and waiting time areaffected by the degree of saturation. Therefore, it is necessary to assess green time or divert some traffic forpublic transportation to other routes.Keywords: signalized intersection, delays, MKJI 1997 ABSTRAK Perkembangan kota yang pesat membutuhkan pemantauan dan evaluasi keadaan persimpangan,terutama di kota-kota yang kekurangan ruang yang tersedia. Akibatnya, penanganan lalu lintasmenjadi sangat penting, sehingga pengetahuan tentang karakteristik volume dan kapasitas segmenjalan menjadi sangat penting. Korelasi perbandingan waktu tunggu persimpangan dan panjang antrian,dengan mempertimbangkan penilaian efektivitas operasi persimpangan yang sedang diselidiki.informasi asli yang dikumpulkan dari survei lapangan di persimpangan Jalan Raya Boyolangu.Sumber utama dari pengumpulan data ini adalah persimpangan Jalan Raya Moh. Yamin -persimpangan Jalan Raya Pucung Kidul. Selain itu, bahan pelengkap untuk penelitian ini diperolehdari perhitungan dan hipotesis yang terdapat dalam buku-buku literatur. Survei volume lalu lintasselama seminggu mengumpulkan informasi untuk analisis data. Highway Capacity Manual (HCM)1985 dan Ide yang terdapat dalam Manual Kapasitas Jalan Indonesia (MKJI) 1997 digunakan untukmengetahui nilai antrian, tundaan, panjang, serta tingkat kejenuhan pendekat persimpangan.Berdasarkan hasil yang diperoleh dari domain tersebut, nilai derajat kejenuhan di Jalan Raya Boyolangu, Jalan Moh. Yamin, dan Jalan Raya Pucung Kidul adalah 0,68, 0,288, dan 1,144. Hal inimenunjukkan buruknya kondisi jalan tersebut karena waktu tunggu dan waktu tunggu dipengaruhioleh derajat kejenuhan. Oleh karena Akibatnya, diperlukan evaluasi waktu hijau atau pengalihansebagian lalu lintas untuk transportasi umum ke rute lain.Kata kunci: persimpangan bersinyal, tundaan, MKJI 1997