Claim Missing Document
Check
Articles

Found 2 Documents
Search

Kajian Kebutuhan Air Irigasi Akibat Perluasan Lahan Musa, Ratna; Hanafi Ashad; Baharuddin Ali
Jurnal TESLINK : Teknik Sipil dan Lingkungan Vol 7 No 1 (2025): Maret 2025
Publisher : Universitas Nusa Putra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/teslink.v1i1.572

Abstract

Debit aliran sungai merupakan salah satu parameter hidrologi yang sangat penting bagi pengelolaan sumber daya air karena data debit sungai dan peramalannya ini sangat diperlukan untuk masa mendatang. Penelitian Ini bertujuan untuk mengetahui tingkat besaran kebutuhan air irigasi pada daerah irigasi matajang. Metode yang digunakan pada penelitian ini adalah metode kurva massa ganda dan metode rata-rata aljabar,perhitungan evapotranspirasi. Hasil perhitungan kebutuhan air/penyiapan (DR) terlihat bahwa dengan mengatur jadwal tanam (mulai penyiapan lahan) yang berbeda-beda akan memberikan kebutuhan air yang berbeda pula, maka didapat besarnya nilai kebutuhan air irigasi maksimal masing-masing pada alternatif I yaitu 2,64 L/detik/ha, alternatif II yaitu 2,41 L/detik/ha dan alternatif III yaitu 2,17 L/detik/ha. Didapatkan nilai kebutuhan air irigasi maksimal yang terkecil yaitu 2,49 L/detik/ha pada periode kedua bulan Oktober. Hasil analisis antara ketersediaan air dengan kebutuhan air terjadi Defisit air pada bulan Maret, Agustus, September dan oktober sedangkan untuk bulan lainnya kebutuhan air irigasi terpenuhi.
Material Requirement Planning (MRP) Pada Pekerjaan Proyek Peningkatan Jalan Klasari-Wonosobo Kabupaten Sorong Howay, Frans; Hanafi Ashad; Watono
Jurnal TESLINK : Teknik Sipil dan Lingkungan Vol 7 No 1 (2025): Maret 2025
Publisher : Universitas Nusa Putra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/teslink.v1i1.575

Abstract

Material mobilization in Eastern Indonesia is different from other locations, difficult road access will cause large shipping prices, so it can affect the increase in the price of a material. The success of a construction work cannot be separated from the optimization of the implementation of three main components, namely cost, time and quality. Each component plays an important role and is interdependent with each other. One of the methods that may be used in material procurement planning is Material Requirement Planning or called MRP. From the problem of scheduling the arrival of materials in the Klasari – Wonosobo Road Improvement project, Sorong Regency, MRP (Material Requirement Planning) can be analyzed, starting with making project scheduling and then continuing with planning the ordering of materials needed during the project with the lot sizing method to produce more efficient material supply time so that it can be used and applied by contractors to plan more material purchases effective and efficient. The results of the research were the material needs of concrete road structures and talud structures in the Klasari-Wonosobo road improvement project in Sorong Regency using the requirement planning method, 925,161 kg of cement material was obtained; rough ggregate ; 2,288,752.50 kg ; Fine agregate 1,545,822 kg ; U24 plain iron 20,259.44 kg; U32 threaded iron 3,181.73 kg and water 490,074 liters. The material that is broken down is cement; rough agregate ; smooth agregate; U24 plain iron and U32 iron. In this MRP method, the material with the largest amount is the most suitable in terms of procurement, storage and use, namely coarse ggregate; 2,288,752.50 kg compared to other materials.