OPTIMASI PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN KOMBINASI CRITICAL PATH METHOD DAN ALGORITMA PARTICLE SWARM OPTIMIZATION Benedictus, Ruspandi Reynaldi; Sumayouw, Marthin Dody; Thambas, Arthur Harris; Malingkas, Grace Yoyce
JURNAL SPEKTRAN Vol 12 No 2 (2024)
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRAN.2024.v12.i02.p06

Abstract

Sebuah proyek merupakan aktivitas yang terjadi dalam durasi waktu tertentu dengan keterbatasan sumber daya, dan bertujuan untuk menghasilkan produk sesuai standar kualitas. Oleh karena itu, penjadwalan proyek yang tepat sangat diperlukan. Salah satu metode untuk mengatasi permasalahan penjadwalan proyek adalah Critical Path Method (CPM), namun CPM hanya mempertimbangkan batasan waktu. Algoritma Particle Swarm Optimization (PSO) yang merupakan salah satu contoh metode metaheuristik, pada penelitian ini diimplementasikan untuk mengoptimalkan penyeimbangan biaya mingguan proyek. Berdasarkan data RAB beserta durasi dan kegiatan pendahulu, dihitung waktu ES, EF, LS, LF dan float setiap kegiatan dengan CPM dibantu aplikasi Microsoft Project dan POM-QM for Windows 5. Hasil tersebut kemudian diproses lebih lanjut menggunakan PSO yang ditulis dalam bahasa pemrograman Python untuk mencari kombinasi waktu dimulainya kegiatan pada jalur non-kritis untuk mendapatkan nilai rata-rata penyimpangan biaya mingguan terkecil. Berdasarkan hasil penelitian, kombinasi waktu dimulainya kegiatan menggunakan PSO dapat memberikan nilai yang lebih optimum dari pada hanya menggunakan CPM saja, dimana PSO memberikan nilai rata-rata penyimpangan biaya mingguan Rp125.283.677, sedangkan CPM Earliest Rp 146.197.206 dan CPM Latest Rp144.526.841.
OPTIMASI SUMBER DAYA PROYEK KONSTRUKSI BANGUNAN MENGGUNAKAN ALGORITMA GENETIKA Luisan, William Alexander; Rompis, Semuel Yacob Recky; Thambas, Arthur Harris; Malingkas, Grace Yoyce
JURNAL SPEKTRAN Vol 12 No 2 (2024)
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRAN.2024.v12.i02.p05

Abstract

Industri konstruksi memegang peranan penting dalam perkembangan perekonomian suatu negara, dengan banyaknya proyek konstruksi yang dilakukan memberikan dampak bagaimana perkembangan industri konstruksi di suatu negara semakin maju. Efisiensi penggunaan sumber daya dalam suatu proyek harus diawali dengan penentuan sumber daya yang tepat dari stakeholder sehingga dengan efisiensi yang dicapai mendukung terlaksananya suatu manajemen proyek yang baik. Proses pengalokasian sumber daya dapat dilakukan dengan perhitungan manual manusia atau dengan memanfaatkan aplikasi komputer. Dalam penelitian ini, pencarian solusi optimal pengalokasian sumber daya memanfaatkan algoritma genetika yang diimplementasikan ke dalam aplikasi yang dibuat, adapun pencarian solusi optimal hanya terbatas pada jumlah pekerja dan tukang (orang hari) dan total biaya. Aplikasi akan menerima Rencana Anggaran Biaya (RAB) sebagai masukan dan memberikan keluaran total pekerja dan tukang (orang hari) serta dengan biaya yang diperlukan pada setiap kegiatan yang ada. Hasil optimasi yang didapatkan menghasilkan total 4876 pekerja/tukang (orang hari) dengan total biaya Rp. 576.630.000.00 yang memberikan hasil lebih hemat 30.19% dari total anggaran pekerja dan tukang di RAB.
Edukasi Penerapan Keselamatan dan Kesehatan Kerja Pada Proyek Konstruksi Bangunan Rumah Ibadah di Minahasa Marthinus, Adrian Philip; Malingkas, Grace Yoyce; Tjakra, Jermias
Archive: Jurnal Pengabdian Kepada Masyarakat Vol. 4 No. 1 (2024): Desember 2024
Publisher : Asosiasi Pengelola Publikasi Ilmiah Perguruan Tinggi PGRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55506/arch.v4i1.136

Abstract

Latar Belakang: Berdasarkan data Prioritas Ketenagakerjaan SDI, jumlah kecelakaan kerja di Indonesia mencapai 162.327 kasus dari Januari hingga Mei 2024. Tingginya angka kecelakaan kerja sebagian besar disebabkan oleh kelemahan sistem manajemen keselamatan dan kesehatan kerja yang diterapkan oleh perusahaan-perusahaan tidak dilakukan peningkatan berkelanjutan (continual improvement). Tujuan: PKM ini bertujuan untuk meningkatkan kesadaran dan pemahaman mengenai penerapan K3 dalam proyek konstruksi, khususnya pada proyek pembangunan rumah ibadah di Minahasa. Metode: PKM menggunakan metode ceramah dan tanya jawab. PKM dilaksanakan pada tanggal 20 Juli 2024 di area direksi kitt. Hasil: Hasil PKM edukasi penerapan keselamatan dan kesehatan kerja meningkat sebanyak 96,5% (Post Test) dari 86% (Pre Test). Kesimpulan: Hal ini menunjukkan peserta menyadari pentingnya menerapkan K3 saat melakukan pekerjaan.
KAJIAN PENERAPAN HEALTH, SAFETY, SECURITY AND ENVIRONMENT (HSSE) MANAGEMENT SYSTEM BERBASIS ISO PADA PT. PELINDO IV (PERSERO) TERMINAL PETIKEMAL BITUNG: Study of the Implementation of the ISO-Based Health, Safety, Security, and Environment (HSSE) Management System at PT. PELINDO IV (Persero) Bitung Container Terminal Marthinus, Adrian Philip; Tjakra, Jermias; Malingkas, Grace Yoyce
PUBLIKASI RISET ORIENTASI TEKNIK SIPIL (PROTEKSI) Vol 6 No 2 (2024): Vol. 6 No. 2 (2024)
Publisher : Universitas Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26740/proteksi.v6n2.p177-182

Abstract

The implementation of the ISO-based Health, Safety, Security, and Environment (HSSE) Management System has become a critical demand in the industrial world to ensure safety, occupational health, security, and environmental protection in the workplace. At PT. Pelindo IV (Persero) Terminal Petikemas Bitung, as one of the main ports in Eastern Indonesia, the ISO-based HSSE Management System is crucial in addressing high work risks, especially with the intensive use of heavy equipment, a large workforce, and high material volume. This research aims to assess the implementation of the ISO-based Health, Safety, Security, and Environment (HSSE) Management System at PT. Pelindo IV (Persero) Terminal Petikemas Bitung. The study was conducted using a survey method through questionnaires and interviews, with the results processed into frequency distribution tables. The research concluded that the assessment of the ISO-based HSSE Management System implementation at PT. Pelindo IV (Persero) Terminal Petikemas Bitung was categorized as “good” in Leadership and Worker Participation, “good” in Planning, “good” in Support and Operation, “good” in Performance Evaluation, and “good” in Continual Improvement.
Perbandingan Metode Standar Nasional Indonesia dan Analisis Harga Satuan Pekerjaan dengan Menggunakan Aplikasi Berbasis Web Gabriela Tangui, Monica; Thambas, Arthur Harris; Malingkas, Grace Yoyce
Action Research Literate Vol. 8 No. 9 (2024): Action Research Literate
Publisher : Ridwan Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/arl.v8i9.617

Abstract

Penelitian ini mengkaji perbandingan metode Standar Nasional Indonesia (SNI) dan Analisa Harga Satuan Pekerjaan (AHSP) tahun 2023 dalam penyusunan Rencana Anggaran Biaya (RAB) proyek konstruksi. Kedua metode digunakan secara luas di Indonesia untuk mengestimasi biaya konstruksi, dengan SNI menawarkan standar yang lebih ketat terkait kualitas dan keamanan, sedangkan AHSP lebih fleksibel dan mempertimbangkan kondisi lokal serta spesifikasi teknis yang lebih rinci. Namun, penerapan manual kedua metode seringkali memakan waktu dan rawan kesalahan. Penelitian ini mengembangkan aplikasi berbasis web untuk memfasilitasi perhitungan otomatis dan perbandingan antara metode SNI dan AHSP. Data yang digunakan diambil dari proyek pembangunan Rumah Dinas Paramedis Puskesmas Duminanga, Bolaang Mongondow Selatan, yang mencakup bahan, upah, dan RAB proyek. Aplikasi yang dikembangkan diharapkan dapat meningkatkan efisiensi dan akurasi dalam penyusunan RAB serta memberikan perbandingan biaya yang lebih transparan antara kedua metode tersebut. Hasil penelitian menunjukkan bahwa metode AHSP lebih ekonomis dibandingkan metode SNI, dengan perbedaan biaya signifikan pada beberapa item pekerjaan. Aplikasi ini diharapkan menjadi alat bantu yang efektif dalam perencanaan dan pengambilan keputusan dalam proyek konstruksi di Indonesia.
Time and Cost Management Analysis Using the Schedule Performance Index (SPI) and Cost Performance Index (CPI) Methods in the Community Health Center Construction Project in Kakaskasen Village, Tomohon City Malingkas, Grace Yoyce
Journal of Social Research Vol. 4 No. 10 (2025): Journal of Social Research
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/josr.v4i10.2734

Abstract

Project management is crucial to the success of infrastructure development, including healthcare facility projects such as community health centers. This study aims to analyze time and cost management in a community health center construction project in Kakaskasen Village, Tomohon City. The research method used earned value management (EVM) analysis to evaluate project performance, specifically schedule and cost. The results showed that the project experienced significant time and cost deviations in several construction projects. The schedule performance index was below 1, indicating project delays, while the cost performance index was also below 1, indicating cost overruns. Factors contributing to the delays included poor coordination with relevant parties, delays in material procurement, and unfavorable weather conditions. Proposed recommendations include improving initial planning, strengthening risk management, and more intensive progress monitoring to ensure project completion meets established targets. This research is expected to contribute to improving the management of similar projects.