Search

OPTIMASI PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN KOMBINASI CRITICAL PATH METHOD DAN ALGORITMA PARTICLE SWARM OPTIMIZATION Benedictus, Ruspandi Reynaldi; Sumayouw, Marthin Dody; Thambas, Arthur Harris; Malingkas, Grace Yoyce
JURNAL SPEKTRAN Vol 12 No 2 (2024)
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRAN.2024.v12.i02.p06

Abstract

Sebuah proyek merupakan aktivitas yang terjadi dalam durasi waktu tertentu dengan keterbatasan sumber daya, dan bertujuan untuk menghasilkan produk sesuai standar kualitas. Oleh karena itu, penjadwalan proyek yang tepat sangat diperlukan. Salah satu metode untuk mengatasi permasalahan penjadwalan proyek adalah Critical Path Method (CPM), namun CPM hanya mempertimbangkan batasan waktu. Algoritma Particle Swarm Optimization (PSO) yang merupakan salah satu contoh metode metaheuristik, pada penelitian ini diimplementasikan untuk mengoptimalkan penyeimbangan biaya mingguan proyek. Berdasarkan data RAB beserta durasi dan kegiatan pendahulu, dihitung waktu ES, EF, LS, LF dan float setiap kegiatan dengan CPM dibantu aplikasi Microsoft Project dan POM-QM for Windows 5. Hasil tersebut kemudian diproses lebih lanjut menggunakan PSO yang ditulis dalam bahasa pemrograman Python untuk mencari kombinasi waktu dimulainya kegiatan pada jalur non-kritis untuk mendapatkan nilai rata-rata penyimpangan biaya mingguan terkecil. Berdasarkan hasil penelitian, kombinasi waktu dimulainya kegiatan menggunakan PSO dapat memberikan nilai yang lebih optimum dari pada hanya menggunakan CPM saja, dimana PSO memberikan nilai rata-rata penyimpangan biaya mingguan Rp125.283.677, sedangkan CPM Earliest Rp 146.197.206 dan CPM Latest Rp144.526.841.
OPTIMASI SUMBER DAYA PROYEK KONSTRUKSI BANGUNAN MENGGUNAKAN ALGORITMA GENETIKA Luisan, William Alexander; Rompis, Semuel Yacob Recky; Thambas, Arthur Harris; Malingkas, Grace Yoyce
JURNAL SPEKTRAN Vol 12 No 2 (2024)
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRAN.2024.v12.i02.p05

Abstract

Industri konstruksi memegang peranan penting dalam perkembangan perekonomian suatu negara, dengan banyaknya proyek konstruksi yang dilakukan memberikan dampak bagaimana perkembangan industri konstruksi di suatu negara semakin maju. Efisiensi penggunaan sumber daya dalam suatu proyek harus diawali dengan penentuan sumber daya yang tepat dari stakeholder sehingga dengan efisiensi yang dicapai mendukung terlaksananya suatu manajemen proyek yang baik. Proses pengalokasian sumber daya dapat dilakukan dengan perhitungan manual manusia atau dengan memanfaatkan aplikasi komputer. Dalam penelitian ini, pencarian solusi optimal pengalokasian sumber daya memanfaatkan algoritma genetika yang diimplementasikan ke dalam aplikasi yang dibuat, adapun pencarian solusi optimal hanya terbatas pada jumlah pekerja dan tukang (orang hari) dan total biaya. Aplikasi akan menerima Rencana Anggaran Biaya (RAB) sebagai masukan dan memberikan keluaran total pekerja dan tukang (orang hari) serta dengan biaya yang diperlukan pada setiap kegiatan yang ada. Hasil optimasi yang didapatkan menghasilkan total 4876 pekerja/tukang (orang hari) dengan total biaya Rp. 576.630.000.00 yang memberikan hasil lebih hemat 30.19% dari total anggaran pekerja dan tukang di RAB.
Pengaruh Pelibatan Tenaga Ahli, Kepatuhan Pekerja dan Pengawasan Pelaksanaan Keselamatan dan Kesehatan Kerja (K3) terhadap Keselamatan Kerja Langitan, Florinda Renda Maria; Thambas, Arthur Harris; Rompis, Semuel Yacob Recky
RIGGS: Journal of Artificial Intelligence and Digital Business Vol. 4 No. 2 (2025): Mei - Juli
Publisher : Prodi Bisnis Digital Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/riggs.v4i2.1869

Abstract

Penelitian ini menganalisis pengaruh pelibatan tenaga ahli, kepatuhan pekerja dan pengawas pelaksanaan Keselamatan dan Kesehatan Kerja (K3) terhadap Keselamatan Kerja. Metode yang dipakai adalah survey kuantitatif dimana populasi dan sampel yang diambil adalah pekerja konstruksi di proyek pembangunan gedung rawat inap RS. Budi Mulia. Total populasi adalah 130 orang dan sample adalah 120 orang (margin of error 2,5%). Analisis data menggunakan metode analisis regresi linier berganda dan diperoleh hasil yaitu Tenaga ahli memiliki, kepatuhan pekerja, dan pengawasan dalam pelaksanaan K3 memiliki pengaruh yang signifikan terhadap keselamatan kerja dengan nilai pengaruh positif yang artinya jika terjadi peningkatan terhadap variabel tenaga ahli, kepatuhan pekerja dan pengawasan, maka variabel keselamatan kerja juga akan ikut meningkat. Dengan demikian maka dalam upaya peningkatan keselamatan kerja maka perlu ditingkatkan hal-hal yang berkaitan dengan tenaga ahli, kepatuhan pekerja dan pengawasan antara lain dengan penambahan jumlah personil tenaga ahli, pelaksanaan pelatihan bagi tenaga dan perlu adanya audit terhadap pelaksanaan K3 di proyek konstruksi.
Analisis Genangan Sungai Bailang Akibat Kombinasi Debit Sungai dan Pasang Surut menggunakan Program Mike 21 Moningka, Frederiko Marchiano Imanuel; Thambas, Arthur Harris; Hendratta, Liany Amelia
JURAL RISET RUMPUN ILMU TEKNIK Vol. 4 No. 2 (2025): Agustus : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v4i2.6171

Abstract

The coastal area of Manado City, particularly the estuary of the Bailang River in Bunaken District, frequently experiences inundation due to the complex interaction between river discharge and tidal fluctuations. This study aims to analyze the spatial distribution and extent of flooding resulting from the combination of river discharge and tides, as well as to evaluate mitigation strategies based on numerical modeling results. A two-dimensional hydrodynamic model was developed using MIKE 21 Flow Model FM HD, utilizing topographic and bathymetric data from DEMNAS and BATNAS, along with 2023 river discharge and tidal data. Simulations were conducted for existing conditions, minimum discharge with maximum tide, and maximum discharge with maximum tide. The results show that tidal influence significantly contributes to the increase in flood extent and duration, especially when high river discharge coincides with peak tidal conditions. The most affected areas are Kelurahan Molas and Tumumpa, located along the riverbanks and near the fish auction port, with inundation covering up to 4.973 hectares and water depths exceeding 0.5 meters. Recommended mitigation strategies include river normalization and the implementation of a real-time hydrodynamic early warning system. This study supports flood risk management and coastal spatial planning, serving as a technical reference for local government policy-making.
Analysis of the Influence of the Construction of the Lolak Dam on Flood Disasters in the Lower Reaches of the Lolak River, Bolaang Mongondow Regency Maramis, Anastasya Amelia; Riogilang, Herawaty; Thambas, Arthur Harris
COMSERVA : Jurnal Penelitian dan Pengabdian Masyarakat Vol. 5 No. 2 (2025): COMSERVA: Jurnal Penelitian dan Pengabdian Masyarakat
Publisher : Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/comserva.v5i2.3304

Abstract

Flooding is one of the disasters that often hit the Lolak Watershed (DAS) area and caused considerable losses. This study aims to evaluate the Lolak Dam in reducing flood risk in downstream areas through a hydraulic modeling approach and develop a flood forecasting model that is able to map flood areas in order to support flood control efforts. The data used include river topography, dam technical data and flood discharge data for 5, 25, 50 and 100 years which are then analyzed using HEC-RAS software version 5.0.7 and the output is input for the preparation of potential flood inundation maps. The results of the study show that the Lolak Dam is able to reduce the water level and reduce the area affected by flooding downstream. In addition, the model is used as in the preparation of hazard maps, vulnerability maps and flood risk maps. This research makes an important contribution to disaster mitigation planning and water resource management based on spatial data and hydraulic simulation.
Analysis and Mitigation of the Impact of Artisanal Gold Mining in Ratatotok Village, Southeast Minahasa Regency Octavina, Beatrix; Riogilang, Herawati; Thambas, Arthur Harris
Jurnal Sosial Teknologi Vol. 5 No. 7 (2025): Jurnal Sosial dan Teknologi
Publisher : CV. Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/jurnalsostech.v5i7.32314

Abstract

Artisanal gold mining in Ratatotok Village, Southeast Minahasa Regency, is an informally growing economic activity that poses significant environmental impacts, particularly on water quality. The use of hazardous chemicals such as mercury (Hg) and cyanide (CN), along with the potential release of arsenic (As), presents a serious threat to groundwater, springs, and rivers utilized by local communities. This study aims to assess water quality by focusing on three key parameters—mercury, cyanide, and arsenic—based on the quality standards stipulated in Government Regulation No. 2 of 2023 (for clean water) and Government Regulation No. 22 of 2021 (for Class III river water). Spatial analysis was conducted using a 500-meter buffer radius from seven sampling points to map pollutant distribution and identify zones of contamination risk. Laboratory results indicate that although all parameter concentrations remain within regulatory thresholds, the levels of arsenic and cyanide at several locations approach the upper limits, suggesting the onset of contamination. Spatial mapping reveals moderate-risk zones concentrated around mining activity areas, warranting targeted mitigation efforts. As a mitigation strategy, this study recommends the implementation of a modular reactor system with cyanide recirculation. This simple and environmentally friendly waste processing technology enables the reuse of cyanide solution in a closed-loop system. Through quantitative and spatial approaches, this study is expected to contribute to the formulation of environmental management policies and adaptive water pollution mitigation strategies tailored to the context of artisanal gold mining areas
Perbandingan Metode Standar Nasional Indonesia dan Analisis Harga Satuan Pekerjaan dengan Menggunakan Aplikasi Berbasis Web Gabriela Tangui, Monica; Thambas, Arthur Harris; Malingkas, Grace Yoyce
Action Research Literate Vol. 8 No. 9 (2024): Action Research Literate
Publisher : Ridwan Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/arl.v8i9.617

Abstract

Penelitian ini mengkaji perbandingan metode Standar Nasional Indonesia (SNI) dan Analisa Harga Satuan Pekerjaan (AHSP) tahun 2023 dalam penyusunan Rencana Anggaran Biaya (RAB) proyek konstruksi. Kedua metode digunakan secara luas di Indonesia untuk mengestimasi biaya konstruksi, dengan SNI menawarkan standar yang lebih ketat terkait kualitas dan keamanan, sedangkan AHSP lebih fleksibel dan mempertimbangkan kondisi lokal serta spesifikasi teknis yang lebih rinci. Namun, penerapan manual kedua metode seringkali memakan waktu dan rawan kesalahan. Penelitian ini mengembangkan aplikasi berbasis web untuk memfasilitasi perhitungan otomatis dan perbandingan antara metode SNI dan AHSP. Data yang digunakan diambil dari proyek pembangunan Rumah Dinas Paramedis Puskesmas Duminanga, Bolaang Mongondow Selatan, yang mencakup bahan, upah, dan RAB proyek. Aplikasi yang dikembangkan diharapkan dapat meningkatkan efisiensi dan akurasi dalam penyusunan RAB serta memberikan perbandingan biaya yang lebih transparan antara kedua metode tersebut. Hasil penelitian menunjukkan bahwa metode AHSP lebih ekonomis dibandingkan metode SNI, dengan perbedaan biaya signifikan pada beberapa item pekerjaan. Aplikasi ini diharapkan menjadi alat bantu yang efektif dalam perencanaan dan pengambilan keputusan dalam proyek konstruksi di Indonesia.