Claim Missing Document
Check
Articles

Found 2 Documents
Search

Faktualisasi Nilai-Nilai Kebangsaan Berbasis UUD 1945 Pada Optimalisasi Kebijakan Pemerintah Berdasarkan Peraturan Mentri No.08 Tahun 2017 Terhadap Kontrak Gross Split di Sektor Migas Indonesia Edy Soesanto; Diah Ayu Kusuma Ningrum; Mohamad Rizqi Putra Prasetyo
Politika Progresif : Jurnal Hukum, Politik dan Humaniora Vol. 1 No. 2 (2024): Juni : Politika Progresif : Jurnal Hukum, Politik dan Humaniora
Publisher : Lembaga Pengembangan Kinerja Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62383/progres.v1i2.252

Abstract

As a solution to overcome the problems in the Cost Recovery Production Sharing Contract system, the Government of Indonesia through the Ministry of Energy and Mineral Resources has issued Regulation of the Minister of Energy and Mineral Resources of the Republic of Indonesia Number 08 Year 2017 on Gross Split Production Sharing Contract. This new regulation was issued due to the decline in the discovery of oil and gas reserves and the decline in non-tax state revenue (PNBP) from the upstream oil and gas sector. The Gross Split Production Sharing Contract scheme also aims to reduce bureaucracy in investment to attract investors to conduct exploration and exploitation in Indonesia. This study aims to analyze the legal aspects related to Gross Split regulations in improving the investment climate in the upstream oil and gas sector, as well as to evaluate the role of the Oil and Gas Special Task Force as an institution responsible for controlling and supervising the activities of the Cooperation Contractor in the Production Sharing Contract.
Evaluasi Penambahan Lapisan Menggunakan Metode SSD (Sliding Sleeve Door) Pada Sumur “RG-3” Lapangan “NR” Nugroho Marsiyanto; Aulia Huda Panindita; Diah Ayu Kusuma Ningrum
Jurnal Bhara Petro Energi Vol.3 No.2 (November 2024)
Publisher : Fakultas Teknik Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/wnj49c88

Abstract

In the "RG-3" Well there are 3 production zones in one wellbore, UA-10, UA-11, and UA-12. The zone produced only UA-10 from 2015 until it experienced a decline in production in 2021 with the latest production reading reaching 3 MMscfd. So efforts need to be made to increase production by doing a good job by opening new zones or existing zones in the well. The "RG-3" well carried out work on adding zone layers by opening the pre-existing UA-12 zone with the hope that the UA-12 zone could increase gas production results. The well intervention work process for adding this layer uses a slickline unit with the open SSD method. The “RG-3” gas well in the "NR" field is located in the Arang Formation layer. The data required in this research is gas production data, work cost data, and other supporting data. In the economic evaluation of adding layers using the SSD method, with a work process of up to 13 days by calculating POT, NPV, and ROR the results reached POT 3 days, NPV = US$ 85.147, and ROR reached 1.007% with the assumption The production results obtained were 8 MMscfd.