Claim Missing Document
Check
Articles

Found 5 Documents
Search

Perencanaan Pemanfaatan Air Blowdown Cooling Tower Untuk Supply Make Up Cooling Tower Di Bandar Udara Internasional Yogyaka.pdf Kurniawanto, Hari; Inten Suwono, Niedya; Nabila Putri, Esa; Budi Santoso, Rahmad; Mulia Fenesa, Rama; Sidiq Muftia Jaya, Gilang
Jurnal Teknik Mekanikal Bandar Udara Vol 2 No 1 (2024): JURNAL TEKNIK MEKANIKAL BANDAR UDARA
Publisher : Program Studi Teknik Mekanikal Bandar Udara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54147/jtmb.v2i1.1125

Abstract

This journal aims to explore the potential utilization of cooling tower blowdown water as a source of make-up water for cooling towers at Yogyakarta International Airport. Currently, the cooling tower work system at the airport relies on water supply from STP and PDAM as an alternative source. However, the use of PDAM water can be reduced by utilizing cooling tower blowdown water which is currently discharged into the canal. In this journal, the writing team will analyze the quality of the resulting cooling tower blowdown water, including the level of contamination and water quality parameters. The methods used include water sampling, water measurement, and water treatment system design. It is hoped that by utilizing cooling tower blowdown water as a make-up supply for cooling towers, it is expected to save PDAM water use, reduce wasted waste, and increase water use efficiency.
Rancang Bangun Sistem Kontrol Motor 3 Phase Berbasis Iot M. Ismail, KGS.; Inten Suwono, Niedya; Maulana, Rizki; Fahrizal, Danis; Setiawan, Singgih; Muliawati, Yuli
Jurnal Teknik Mekanikal Bandar Udara Vol 2 No 1 (2024): JURNAL TEKNIK MEKANIKAL BANDAR UDARA
Publisher : Program Studi Teknik Mekanikal Bandar Udara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54147/jtmb.v2i1.1137

Abstract

An induction motor, which is particularly useful in the aviation sector, is a motor that runs on alternating current, or AC energy. Because they are highly effective and reasonably priced for the industrial sector, three phase induction motors are commonly employed in this industry. A 3-phase induction motor's inability to maintain a consistent speed in the event of a fast load shift is one of its limitations. Its multiple non-linear characteristic characteristics are another. Therefore, a controller is required to provide a steady speed and improved system performance against variations in load. Three-phase induction motor speed control may be achieved in a number of ways, one of which is through the advancements in control systems brought about by the growing usage of the internet. The Internet of Things, or IoT, is an improvement in technology that allows several electrical items to be remotely managed via the internet, providing a faster and more effective control mechanism
ANALISIS KERUSAKAN UJUNG AS T-LINK CONVEYOR TERMINAL KEDATANGAN DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR Kurniawanto, Hari; Inten Suwono, Niedya; Tangkas Bramanto, Halim; Alkholif, Muhammad Qomarudin; Nabila Putri, Dea; Tri Saputra, Akbar Reza
Jurnal Teknik Mekanikal Bandar Udara Vol 1 No 02 (2023): Jurnal Teknik Mekanikal Bandar Udara
Publisher : Program Studi Teknik Mekanikal Bandar Udara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54147/jtmb.v1i02.1037

Abstract

This research aims to improve the safety and comfort of BaggageHandling System (BHS) users, especially at the domestic arrival terminalin order to facilitate flights at Sultan Hasanuddin International Airport,through improving and optimizing the performance of the BHS, especiallyAs T-Link section to connect the T-Link and the arrival pallet conveyor.For damage to the end of the T-Link As, it can be handled by changingparts. The cause of the tip of As T-Link is damaged after observationaldata collection, there are a number of disassembly that are not inaccordance with the SOP for disassembling the As T-Link roller bearing,one of which is by using a hammer. Thus, so that this problem does notoccur again, it is necessary to add additional applicable SOPs, one ofwhich is the use of trekkels in disassembling roller bearings, providing WD when disassembling roller bearings, and applying grease after installing rollerbearings
ANALISA DAN PENANGANAN KERUSAKAN TERMOSTAT PADA AIR CONDITIONER SPLIT WALL Ismail, KGS.M; Inten Suwono, Niedya; Prasetianto, Indra; Putra Pratama, Delvin; Ghufroon; Bimantoro, M.Dimas Aji
Jurnal Teknik Mekanikal Bandar Udara Vol 1 No 02 (2023): Jurnal Teknik Mekanikal Bandar Udara
Publisher : Program Studi Teknik Mekanikal Bandar Udara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54147/jtmb.v1i02.1039

Abstract

The world of Aviation Industry in Indonesia continues to experiencedevelopments in various fields. With this development, airports thatoperate must have adequate facilities. Airport buildings ranging fromterminals to supporting buildings must have a comfortable temperature.So here a tool is needed to regulate the room temperature of thebuildings at the airport. The tool in question is Air Conditioning (AC).This research is based on events that are often found in air conditioners.After analyzing, it was found that the thing that caused the airtemperature in the room to be unstable was damage to the thermostat component. Where the thermostat component functions as a sensor thatcontrols the temperature to be cooler / warmer as needed. With arelatively cool room temperature, this can make passengers feelcomfortable at the airport. Air Conditioning (AC) maintenance is veryimportant so that the condition of the AC components remains excellentand the engine can function properly without damage.
Analisis Efektivitas Fan Coil Unit Terhadap Pendinginan Area Bandar Udara Internasional Jenderal Ahmad Yani Semarang Kurniawanto, Hari; Inten Suwono, Niedya; Putri, Anatasya Delpia; Perangin Angin, Davin Gustio; Lanang Jati, Ignasius Prabadhatu; Juwita, Salsabila
Jurnal Teknik Mekanikal Bandar Udara Vol 1 No 3 (2023): JURNAL TEKNIK MEKANIKAL BANDAR UDARA
Publisher : Program Studi Teknik Mekanikal Bandar Udara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54147/jtmb.v1i3.1081

Abstract

Jendral Ahmad Yani International Airport Semarang has many scheduled flights, but there are some problems with the Fan Coil Unit. One of them is the wrong temperature when sent to a certain point in the room, which disturbs user comfort. The absence of Air Curtain and Window film in the area causes the temperature in the room to not meet capacity, especially in the check-in area of ​​Jenderal Ahmad Yani International Airport, Semarang. The results of this study can make the FCU work better and achieve the desired level of temperature accuracy by adding heat-reducing media such as air curtains, film, downlights, roof insulators which can maximize efficiency and channel temperature of the room considering that the Fan Coil Unit is one of the cooling aids which is quite important and always operates at the airport