Konsep Dasar Transmisi Tenaga Listrik: Klasifikasi, Komponen Serta Gangguannya Aan Sumiyati; Putri Shabira Rahman; Muhammad Habil Cahaya Gusti; Gregorius Diera Arnandi Melkior; Johan Hidayat; Didik Aribowo
JURNAL SURYA TEKNIKA Vol. 11 No. 2 (2024): JURNAL SURYA TEKNIKA
Publisher : Fakultas Teknik UMRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37859/jst.v12i1.8195

Abstract

Electric transmission lines have a vital role as a bridge between electrical energy resources and distribution points to final consumers. In classifying transmissions, aspects such as the installation technology used, the voltage level applied, and the physical channel distance are very influential in ensuring overall operational system efficiency. However, this transmission system does not require various challenges that need to be overcome, such as power losses that can occur during the transmission process, technical problems that can arise at any time, and the risk of too much dependence on main connected lines. Dramatic events such as mass power outages in the Java-Bali region in 2019 show how important it is to increase infrastructure capacity, increasing regular maintenance programs. This research uses a qualitative approach through a literature analysis study which is used to explore issues related to the electricity transmission system in Indonesia, with the research results underlining the need for increased supervision and policy crisis management as well as carrying out stricter maintenance to maximize electricity availability effectively in the future.
Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo Johan Hidayat; Muhammad Fatkhurrokhman
Venus: Jurnal Publikasi Rumpun Ilmu TeknikĀ  Vol. 2 No. 6 (2024): Desember : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i6.635

Abstract

Maintenance of 20 kV cubicles at PT. Haleyora Powerindo is a crucial step in ensuring the reliability and safety of the electrical distribution system. This process includes preparation stages such as inspecting work equipment, coordinating power outages, and utilizing safety equipment (PPE) to minimize the risk of accidents. Subsequent steps involve voltage disconnection, verifying zero voltage using detection tools, cleaning components with specialized fluids, and drying to ensure that moisture does not cause disruptions. Once all stages are completed, the voltage is carefully reactivated, and a maintenance report is prepared to document the process. This study employs direct observation, interviews, and document analysis to evaluate the maintenance implementation and provide recommendations for quality improvement. The results are expected to serve as a guide for other companies in enhancing the efficiency and reliability of 20 kV cubicle maintenance to ensure a stable electricity supply.