Claim Missing Document
Check
Articles

Found 2 Documents
Search

Modeling Ground Access Traffic Based On Air Passenger Data In Juanda International Airport Wiryanta Wiryanta; Ervina Ahyudanari
Jurnal Transportasi: Sistem, Material, dan Infrastruktur Vol 1, No 1 (2018): Special Issue
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat - Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1115.942 KB) | DOI: 10.12962/j26226847.v1i1.3792

Abstract

Airport attracts large scale of demand to travel in. Most air travelers use private cars or taxi to reach and leave the airport. This number leads to congestion and reducing the quality of air in and around airport. The effect of increasing number of air traveler to the quality of ground access demands the airport to re-evaluate the design of the available access mode. To evaluate the available design of access mode, this study requires data of air travelers as well as the airplane schedules in Juanda International Airport Surabaya. The data incorporate the economic growth results in prediction of future demand that will occupy the road access to airport. This research attempts to build a model to generate potential passengers in inducing traffic congestion. This model suggests the period of airport operational to develop alternative access modes to reduce the congestion level.  The model shows that in 2020, every air traveler generates 3.6 vehicle trips of ground access traffic.
Penyiapan Pondasi dan Lantai Bangunan Utama Pengolahan Sampah di Dukuh Ngipikrejo II, Desa Banjararum, Kabupaten Kulonprogo Iman Haryanto; Hotma P Sulistyadi; Syaukat Ali; Wiryanta Wiryanta; Edi Kurniadi; Agus Kurniawan
Jurnal Pengabdian dan Pengembangan Masyarakat Vol 1, No 2 (2018): NOV
Publisher : Pengabdian dan Pengembangan Masyarakat Sekolah Vokasi UGM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22146/jp2m.43465

Abstract

Banjararum village does not have solid waste processing facility (“tempat pengolahan sampah” atau TPS) yet. The community service activity program aims to design TPS area site plan, TPS building (especially foundation and floor), and carry out the construction work. The building is located at village property site and includes area of 1000 m2. The work activities include location survey, surveying, site plan preparation, review and finalizing of site plan by team and village government partner, land clearing, bouwplank fixing, cut work, foundation construction, soil filling for floor levelling, construction of other building elements (column, wall, roof), tile fixing, and reporting. Technical data are consisted: floor area by dimension of 11´6 m, three maturity pools by dimension 3.5´4 m per pool, continuous river stone foundation (by dimension of height, base width, and top width of 0,6´0,6´0,3 m) and a layer beneath foundation made by river sands and stones. Village government partner assists team work through labor and material procurement and carry out daily supervising.