Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : SEMINAR TEKNOLOGI MAJALENGKA (STIMA)

METODE PELAKSANAAN PEKERJAAN BOREPILE, PILECAP DAN PIER KOLOM PADA PEKERJAAN JEMBATAN KEDONDONG TOL CISUMDAWU SEKSI 5B Wardani; Heryadiana, Asep Dian
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.902

Abstract

Transportation is an inseparable part of human survival. Related to human activities,transportation plays a very significant role in social, economic, environmental and other aspects.Tol Road is a public and closed road where its construction is charged to cross according to theapplicable tariffs. This road is a form of tariff grant on the road that is generally applied to coverthe cost of construction and maintenance of the road. Tol Road Cisumdawu is one of the road freeof barriers that crosses from the area of Cileunyi, Sumedang, Dawuan. This Tol road is no morethan an effort to streamline traffic to improve the distribution of goods and services that grow theeconomy around, as well as become one of the fast access between the districts of the city. A bridgeis a building that allows a road to cross a river, valley or other road of different elevations. In theplanning of the bridge must take into account the functional needs of transportation. This journalfocuses on methods of implementation of pile bore, pilecap, as well as pier work located on theconstruction project of Road Tol cisumdawu section 5 b located in the village of cipelangkecamatan ujungjaya sumedang.
PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMELIHARAAN JALAN TALAGA – SANGIANG KAB. MAJALENGKA Alya, Rio; Heryadiana, Asep Dian
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.979

Abstract

Road maintenance is an effort to improve road conditions that are functionally feasible and structurally feasible, so the handling of roads must be in accordance with the type of damage experienced by the road. Inappropriate handling will only throw away the budget spent because its function will not be optimal and will definitely break again quickly.A road requires maintenance and maintenance on road construction and parts of the road construction. With road maintenance, it can maintain the condition of the road when the road is completed until the planned age is reached on the road.Damage to the road will cause a lot of losses that can be felt by users directly, because it will certainly hamper the speed and comfort of road users and cause many victims due to road damage that is not immediately handled by the agency that handles it. Basically planning the life of the road pavement is adjusted to the conditions and needs of the existing traffic, generally designed within a time limit of 10-20 years, which means that the road is expected not to suffer damage in the first 5 years. However, if in reality the road is damaged before the first 5 years, then it is certain that the road will experience major problems in the future (Hardiyatmo, 2007).In order to maintain road conditions at a proper performance in serving various modes of transportation, it is necessary to evaluate the road surface to find out whether the road is still in good condition or there is a need for an improvement program for routine maintenance or periodic maintenance. The form of road maintenance depends on the results of the damage condition assessment.road surface that has been determined visually, while several methods that are often used are the Bina Marga method (1990) and the PCI (pavement condition index) method (Hardiyatmo, 2007).