This Author published in this journals
All Journal TEKNOSIAR
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PENGARUH FAKTOR SUMBER DAYA MANUSIA, BIAYA, BAHAN, DAN PERALATAN TERHADAP PENYELESAIAN PROYEK PEMBANGUNAN GEDUNG ASRAMA TERPADU MAN 2 FLORES TIMUR Ropi, Sarina S.; Meo, Yohanes; Gado, Alfridus
TEKNOSIAR Vol. 15 No. 2 (2021): Volume 15 Nomor 2 Oktober 2021
Publisher : Program Studi Teknik Sipil dan Program Studi Arsitektur Fakultas Sains & Teknologi Universitas Flores

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37478/teknosiar.v15i2.2575

Abstract

According to the contract, the implementation of the work on the construction of the East Flores MAN 2 integrated dormitory building project ending on December 31 2020 has reached 100%, but only 3.68% of the project has experienced delays. This study aims to determine the effect of human resource factors, costs, materials and equipment on the completion of the East Flores MAN 2 integrated dormitory building project. With a quantitative descriptive method. The data for this study were sourced from questionnaires distributed to 25 respondents who were stratified by population stratification into project owners, contractors, consultants, foremen, builders, and laborers. The results of the analysis obtained sig. Human resources of 0.028 <0.05 and t count -23.067 > t table 12.71. sig. value Cost of 0.041 <0.05 and t count 15.635 > t table 12.71. sig. value Material of 0.006 <0.05 and t count 98.758 > t table 12.71. sig. value Equipment of 0.017 <0.05 and t count -37.437 > t table 12.71. The conclusion is that there is an influence of human resource factors, costs, materials, and equipment on the completion of the East Flores MAN 2 integrated dormitory building project, and material factors are the most influential.