Claim Missing Document
Check
Articles

Found 2 Documents
Search

Sosialisasi Strategi Branding E-Commerce pada Pelaku UMKM di Kelurahan Manggar Ismiyati, Nur; Jumriana, Jumriana; Rizki A, Andhika Ade; Prasetyo, Sukono Hadi; Prasetya, Audrey Putri; Farras, Muhammad Anwar; Rahman, Rezki Abdul; Pratama, Gery Andra Putra; Alim, Putra Chandra Rachmat; Haris, Muhammad Fadel; Amirullah, Amirullah; Yahya, Rony
Abdimas Universal Vol. 7 No. 1 (2025): April
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat Universitas Balikpapan (LPPM UNIBA)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36277/abdimasuniversal.v7i1.1793

Abstract

University of Balikpapan continues to innovate in providing benefits to the community through the Real Work Lecture (KKN) program. Manggar Village KKN students carried out E-Commerce Branding Socialization activities as a better marketing and financial monitoring medium. This activity was attended by MSME actors in the local Manggar Village area which was held on August 25, 2024. This socialization activity aims to introduce and increase understanding of the use of digital technology, especially the E-Commerce system as a marketing tool for MSME actors. This activity method is carried out in 2 stages, namely the preparation stage and the implementation stage of the activity. Through digital marketing, MSMEs have wider opportunities to market products and a larger market reach. With this knowledge and skills, it is hoped that MSME actors can optimize market potential through digital marketing and are expected to be able to empower MSME actors to be able to compete in a better digital era. The results of this activity were that 85 MSME actors attended this activity and the enthusiasm of the participants to ask questions in this activity.
Analisis Keterlambatan Proyek Pembangunan Gudang dengan Precedence Diagram Method (PDM) dan Program Evaluation and Review Technique (PERT) Alim, Putra Chandra Rachmat; Pratiwi, Reno; Devi, Suheriah Mulia
Jurnal Talenta Sipil Vol 9, No 1 (2026): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i1.1110

Abstract

Construction project delays are a common issue that significantly affect cost, quality, and completion time. This condition occurred in the construction of the PT Telkom Closed Warehouse in Balikpapan, which was originally planned to be completed within 90 calendar days but experienced a 28-day delay, resulting in a total completion time of 118 days. The delay was mainly caused by weak supervision and the absence of a structured planning method from the beginning. This study aims to analyze critical activities using the Precedence Diagram Method (PDM) and to calculate the probability of project completion using the Program Evaluation and Review Technique (PERT). The analysis results indicate that concrete structure work, wall installation, flooring, roofing, and mechanical-electrical work were identified as critical path activities. In addition, the PERT method provided an overview of the probability of achieving the actual project schedule. The conclusion of this research emphasizes that the application of PDM and PERT can help contractors plan schedules more accurately, reduce the risk of delays, and optimize the use of project resources.