EVALUASI RESIKO K3 PADA PERAWATAN JEMBATAN TIMBANG DI PT. CAHYO PERMATA ABADI DENGAN METODE JOB SAFETY ANALYSIS Qishas, Haechal Fachar; Putra, Al Fiillian Sah; Saputra, Muhammad Zeit Geist; Al Hafiz, Muhammad Rafi; Wirayudha, Muhammad Hafidz; Yuslistyari, Eka Indah
Jurnal Intent: Jurnal Industri dan Teknologi Terpadu Vol 7 No 2 (2024): INDUSTRIAL
Publisher : Prodi Teknik Industri, Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/intent.v7i2.3872

Abstract

PT Cahyo Permata Abadi is a company that provides precision measurement solutions and high-quality services for various industries by ensuring accuracy and efficiency in every project, so it is important to pay attention to the K3 aspect in the maintenance activities carried out, one of which is in the field of weighbridge maintenance services. This study aims to analyze the Occupational Safety and Health (K3) risks at PT. Cahyo Permata Abadi in weighbridge maintenance activities. The research method is Job Safety Analysis (JSA). The results of the Risk Analysis study show that several activities have significant potential hazards. In troubleshooting, there is a risk of electric shock and muscle injury with a risk value of 9. Checking the electrical system faces the risk of electric shock and short circuits with a risk value of 8. Other activities such as sensor calibration, platform cleaning, and load testing have moderate risks with potential hazards such as falling from a height, slipping, and being hit by a load. Research suggestions for risk control should be carried out through various safety measures, including the use of Personal Protective Equipment (PPE) such as insulating gloves, safety shoes, and full body harnesses. In addition, safety procedures such as Lock Out Tag Out (LOTO), warning signs, and safe work procedures are also implemented. These controls are designed to minimize potential hazards and ensure worker safety while carrying out these activities.
Optimalisasi Waktu dan Biaya dengan Penambahan Jam Kerja Lembur 3 Jam dan Shift Kerja Sudianto, Toto; Mahendra, Muhammad Oka; Putra, Al Fiillian Sah; Qishas, Haechal Fachar
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 2 (2025): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i2.43941

Abstract

In construction projects, delays often occur, causing increased costs and delays in completion. This study analyzes project acceleration with the crashing method on the Untirta Rectorate Building Construction Project, comparing the alternatives of 3-hour overtime and work Shifts. The goal is to determine the optimal project duration and cost. The analysis shows that there are 14 jobs on the critical path. The results of acceleration with 3-hour overtime resulted in a project cost of Rp3,104,007,500 with a duration of 431 days, while work Shifts require Rp1,280,228,250 with a duration of 427 days. The total slope cost for 3-hour overtime is Rp193,244,923.38, and work Shifts Rp36,611,338.93. Alternative cost comparison shows that overtime has direct costs of Rp49,158,386,780 and indirect costs of Rp3,971,376,850, while Shift work has direct costs of Rp47,334,607,530 and indirect costs of Rp3,962,700,980. Shift work is more efficient in terms of cost and time.