ANALISIS CHANGE ORDER RATIO PADA PROYEK KONSTRUKSI RUMAH TINGGAL STUDI KASUS DI DAERAH TANGERANG Bataric, Rosani Surya; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 1, Februari 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i1.32602

Abstract

The construction industry plays an important role in economic growth, especially in infrastructure and housing. However, this industry is faced with various challenges, one of which is change orders that can hinder the smooth implementation of the project. Change order is a change in the provisions of the original contract document made in writing and documented between the project owner and the project implementer. These changes can have an impact on the price, project schedule, and schedule for contract payments. The purpose of this study is to analyze the magnitude of the change order ratio value and identify the causes of change orders based on job classification in a residential construction project. This research uses a case study of residential houses in the Tangerang area. Based on the results of research and calculation, the total value of change order ratio is 2.15%, for change order ratio in addition 1.60%, and change order ratio in subtraction 0.55%. Architectural and structural work which is the category of work with the largest change order impact on this residential construction project is one of the causes due to changes in the design of the building which causes changes in the volume of work. Abstrak Industri konstruksi memegang peranan penting dalam pertumbuhan ekonomi khususnya dalam bidang infrastruktur dan perumahan. Namun industri ini dihadapkan pada berbagai tantangan, salah satunya change order yang dapat menghambat kelancaran pelaksanaan proyek. Change order adalah perubahan ketentuan dokumen kontrak asli yang dibuat secara tertulis dan didokumentasikan antara pemilik proyek dan pelaksana proyek. Perubahan tersebut dapat berdampak pada harga, jadwal proyek, dan jadwal untuk pembayaran kontrak. Tujuan dari penelitian ini adalah untuk menganalisis besarnya nilai change order ratio dan mengidentifikasi penyebab terjadinya change order berdasarkan klasifikasi pekerjaan pada suatu proyek konstruksi rumah tinggal. Penelitian ini menggunakan studi kasus rumah tinggal di wilayah Tangerang. Berdasarkan hasil penelitian dan perhitungan, diperoleh nilai total change order ratio 2,15%, untuk change order ratio in addition 1,60%, dan change order ratio in subtraction 0,55%. Pekerjaan Arsitektur dan Struktur yang menjadi kategori pekerjaan dengan dampak change order terbesar pada proyek konstruksi rumah tinggal ini salah satu penyebabnya adalah karena adanya perubahan pada design bagunan yang menyebabkan adanya perubahan pada volume pekerjaan.
ANALISIS PENYEBAB PEMBENGKAKAN BIAYA PADA PROYEK KONSTRUKSI RUMAH TINGGAL X Bataric, Rosani Surya; Waty, Mega
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 3, Agustus 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i3.34180

Abstract

One of the important construction subsectors to fulfill people's basic needs is housing development. However, cost overrun or project cost escalation is one of the difficulties that projects often face during implementation. This research aims to identify and analyze the factors that cause cost overruns in residential construction projects, especially from the point of view of the parties directly involved in the construction process, for example project managers, site engineers, and quantity surveyors. Data was collected through the distribution of questionnaires in the form of Google Forms with a Likert scale ranging from 1-5. With the help of SPSS software, the collected data was processed through validity and reliability tests. Furthermore, the Relative Importance Index (RII) approach was used to analyze the data and identify the main factors causing cost overruns in the X residential construction project. Factors affecting cost overruns in X residential construction project can be ranked using 19 variables that passed the validity and reliability tests out of 22 collected variables. As a result of this study, the main cause of cost overruns in X residential projects is Inaccurate Material and Wage Cost Estimates with an RII value of 0.82. Abstrak Salah satu subsektor konstruksi yang penting untuk memenuhi kebutuhan dasar masyarakat adalah pengembangan perumahan. Namun, pembengkakan biaya atau eskalasi biaya proyek adalah salah satu kesulitan yang sering dihadapi proyek selama pelaksanaan. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis faktor-faktor penyebab pembengkakan biaya (cost overrun) pada proyek pembangunan rumah tinggal, khususnya dari sudut pandang para pihak yang terlibat langsung dalam proses konstruksi contohnya project manager, site engineer, dan quantity surveyor. Pengumpulan data melalui penyebaran kuesioner dalam bentuk Google Form dengan skala Likert yang berkisar 1-5. Dengan bantuan perangkat lunak SPSS, data yang telah dikumpulkan diproses melalui uji validitas dan reliabilitas. Selanjutnya, pendekatan Relative Importance Index (RII) digunakan untuk menganalisis data dan mengidentifikasi faktor-faktor utama penyebab kelebihan biaya dalam proyek pembangunan rumah tinggal X. Faktor-faktor yang mempengaruhi pembengkakan biaya dalam proyek konstruksi rumah tinggal X dapat diberi peringkat menggunakan 19 variabel yang lulus uji validitas dan reliabilitas dari 22 variabel yang dikumpulkan. Hasil dari penelitian ini, penyebab utama pembengkakan biaya dalam proyek rumah tinggal X adalah Estimasi Biaya Material dan Upah yang Tidak Akurat dengan nilai RII sebesar 0,82.