PENGARUH UKURAN BUTIRAN MAKSIMUM TERHADAP KUAT TEKAN REACTIVE POWDER CONCRETE Sutandi, Arianti; Kushartomo, Widodo
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan Vol 3, No 1 (2019): Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmstkik.v3i1.5193

Abstract

Kuat tekan beton merupakan faktor yang paling dominan untuk menentukan kualitas beton dibandingkan faktor lainnya. Kuat tekan beton atau mutu beton dipengaruhi oleh beberapa faktor diantaranya adalah perbandingan semen terhadap air (fa/s), kualitas material, perbandingan komposisi material dan sebagainya. Gradasi butiran agregat  juga merupakan salah satu faktor yang berperan penting untuk menentukan mutu beton. Agregat dengan ukuran butiran yang lebih halus dan bervariasi dapat memperkecil volume pori yang terbentuk, sehingga susunan butiran yang baik akan menghasilkan kepadatan tinggi dan porositas minimum. Pada penelitian ini dipelajarai pengaruh ukuran butiran maksimum agregat halus terhadap  kuat tekan reactive powder concrete. Benda uji dibuat dalam bentuk silinder dengan diameter 100,0 mm dan tinggi 200,0 mm. Ukuran diameter maksimum agergat halus dibuat dalam tiga jenis yaitu 300 µm. 425 µm, dan 600 µm. Seluruh benda uji dirawat dengan teknik perendaman selama 3 hari, dilanjutkan dengan steam curing pada temperature 90 oC – 95 oC selama 4 jam. Pengujian kuat tekan dilakukan pada umur 7 hari. Hasil pengujian menunjukkan terjadinya peningkatan kuat tekan recative powder concrete dengan bertambah kecilnya ukuran butiran maksimum agregat halus. The compressive strength of concrete is the most dominant factor to determine concrete quality compared to other factors. Concrete compressive strength and grade are influenced by several factors, including water cement ratio (fa/s), material quality, material composition, and others. Aggregate gradation is also one of the dominant factors that play an important role in determining the quality of concrete. Finer and varied aggregate size can reduce void volume, so that a good granular structure will produce high density and minimum porosity. In this research, the effect of maximum size of fine aggregate on the compressive strength of reactive powder concrete was studied. The specimens were made in cylindrical shapes with a diameter of 100.0 mm and a height of 200.0 mm. The maximum diameter size of fine agergate was varied in three types, 300 µm. 425 µm, and 600 µm. All specimens were treated with immersion technique for 3 days, followed by steam curing at 90 oC - 95 oC for 4 hours. Compressive strength testing was done at the age of 7 days. The test results showed that the increase of maximum fine aggregate size increase the compressive strength of reactive powder concrete.
MEMPERKIRAKAN PERBANDINGAN KADAR AIR SEMEN PADA BETON KERAS Kushartomo, Widodo; Sutandi, Arianti; Linggasari, Dewi
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan Vol 4, No 1 (2020): Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmstkik.v4i1.7416

Abstract

Comparison of cement water content (w / c-ratio) is one important factor to determine the strength of concrete, so it is important to know the ratio of the amount of water used in a concrete mix. Many problems that arise related to the quality of concrete in ready-made buildings require an in-depth investigation of the composition of concrete materials in order to estimate the quality of concrete including the ratio of the amount of water to cement. Estimating the ratio of the amount of water to the amount of cement in hard concrete is not an easy matter, there are many factors that influence it. A number of special tests are needed on hard concrete to get the accuracy of the ratio of cement water content (w / c-ratio). A number of test specimens were prepared for testing with known water content and amount of cement. After going through the treatment process for 28 days, at the age of 60 days all test specimens are examined both chemically and volumetricly to recalculate the amount of water and cement that has been used. The calculation results show the technique used has a suitability of 99% to the planning. ABSTRAKPerbandingan kadar air semen (w/c-ratio) merupakan salah satu faktor penting untuk menentukan kekuatan beton, sehingga penting sekali mengetahui perbandingan jumlah air yang digunakan dalam suatu adukan beton. Banyak permasalahan yang muncul terkait mutu beton pada bangunan yang sudah jadi memerlukan penyelidikan     yang mendalam terhadap komposisi material beton tersebut guna memperkirakan mutu beton termasuk didalamnya perbandingan jumlah air terhadap semen. Memperkirakan perbandingan jumlah air terhadap jumlah semen pada beton keras bukan merupakan suatu perkara yang mudah, ada banyak faktor yang mempengaruhinya. Diperlukan sejumlah pengujian khusus pada beton keras untuk mendapatkan akurasi nilai perbandingan kadar air semen (w/c-ratio). Sejumlah benda uji disiapkan untuk pengujian dengan kadar air dan jumlah semen yang telah diketahui. Setelah melalui proses perawatan selama 28 hari, pada umur 60 hari seluruh benda uji diperiksa baik secara kimiawi maupun secara volumetrik untuk menghitung ulang jumlah air dan semen yang telah digunakan. Hasil perhitungan menunjukkan teknik yang digunakan  memiliki kesesuaian sebesar 99% terhadap perencanaan.
Effek Ukuran Butiran Maksimum terhadap Nilai Modulus of Rupture Reactive Powder Concrete Kushartomo, Widodo; Linggasari, Dewi; Sutandi, Arianti
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (588.359 KB) | DOI: 10.14710/mkts.v26i1.25088

Abstract

Modulus of rupture (R) is a measurement of a tensile strengh of a concrete beam. The value of R is affected by the size of fine aggregat grain, the density of the concrete beam and the water-cement ratio. The unit of R is MPa expressing the tensile strength of the concrete beam without reinforcement to withstand a buckling failure. The distance between the supports of the concrete beam should not be less than three times of the height of the beam. In this research the size of the concrete beam speciment was 100 mm x 100 mm x 350 mm, the maximum fine aggregate size was varied (300 µm, 425 µm, and 600 µm) and the water-cement ratio was also varied (0.25, 0.22 and 0,20). All speciments were cured by steam curing and were tested after seven days. The results show that the larger the size of the fine aggregat grain and the higher the water-cement ratio, the smaller the R.
PERHITUNGAN PREDIKSI DURASI PROYEK GEDUNG BERTINGKAT MENGGUNAKAN METODE EARNED SCHEDULE Erwan, Codey; Anondho, Basuki; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 3, Agustus 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i3.28035

Abstract

One quick way to address urban population growth is to support the construction of tall buildings. This research was designed using quantitative method. The purpose of this study is to predict the duration per meter2 of high-rise building construction based on the gross floor area (GFA) and the number of levels worked on for Jakarta and surrounding areas. Data collection on the duration of ongoing projects as many as 36 projects. The data analysis procedure goes through the stages of collecting data on the duration of real and ongoing projects with the calculation of the Earned Schedule method, validating data using the Altman Z score method, analyzing the relationship between duration and gross floor area (GFA) and number of levels, and testing the feasibility of the analysis results. From the results of this study, a fairly good correlation coefficient (R) of 0.906 was obtained, which means that the correlation between the dependent variable and the two independent variables is very strong. The coefficient of determination (R2) is 0.821 or 82.1%, indicating that the independent variables are able to explain the duration prediction very well. This research produces a prediction model of duration per meter2 of multi-storey building construction based on gross floor area (GFA) and number of levels. Abstrak Salah satu cara cepat untuk mengatasi pertumbuhan populasi perkotaan yakni mendukung pembangunan bangunan tinggi. Penelitian ini dirancang dengan metode kuantitatif. Tujuan penelitian ini adalah untuk memprediksi durasi per meter2 konstruksi bangunan gedung bertingkat berdasarkan luas lantai dan jumlah lantai yang dikerjakan untuk daerah Jakarta dan sekitarnya. Pengumpulan data durasi proyek tengah berjalan sebanyak 36 proyek. Prosedur analisis data melalui tahapan pengumpulan data durasi proyek nyata maupun berjalan dengan perhitungan metode Earned Schedule, validasi data dengan metode uji selisih rata-rata, analisis hubungan antara durasi dengan luas lantai dan tinggi lantai, dan uji kelayakan hasil analisis. Dari hasil penelitian ini diperoleh nilai koefisien korelasi (R) yang cukup baik sebesar 0.906 mengartikan bahwa korelasi antara variabel dependen dengan kedua variabel independen termasuk sangat kuat. Koefisien determinasi (R2) sebesar 0.821 atau 82.1%, menunjukkan variabel independen mampu menjelaskan prediksi durasi dengan sangat baik. Penelitian ini menghasilkan model prediksi durasi per meter2 konstruksi bangunan gedung bertingkat berdasarkan luas lantai dan jumlah lantai.
PREDIKSI DURASI PROYEK BANGUNAN TINGGI DENGAN METODE EARNED SCHEDULE Theddy, Vincent; Anondho, Basuki; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 3, Agustus 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i3.30711

Abstract

Infrastructure development in Indonesia isn’t only in the capital, development has begun to spread to other cities. One of the existing infrastructure developments is high-rise buildings. High-rise buildings are being used now because land is limited and the demand for space for activities is increasing. Earned value management (EVM) is a well-known management system that addresses cost, schedule and technical performance. Because EVM has problems in calculating duration, the concept of earned schedule (ES) emerged. The problem discussed is whether the ES method can be used to predict the duration of high-rise building projects. The aim of this research is to obtain a duration prediction calculation model, which it can be seen whether the ES method can be used to predict the duration of high-rise building projects. The data analysis goes through the stages of collecting real and ongoing project duration data using the ES calculation, data validation using the average-difference test method, and data analyzed using a statistical test approach, namely the t-test and Z-test. The results show that the T-test is 0.663 (limit ±2.045) and the Z-test is 0.67121 (limit ±1.96), so the hypothesis can be accepted, which means that calculating duration using the ES method can be used to predict the duration of high-rise building projects. Abstrak Pembangunan infrastruktur di Indonesia tidak hanya di ibukota saja, pembangunan sudah mulai menyebar ke kota lain. Salah satu dari pembangunan infrastruktur yang ada adalah bangunan tinggi. Bangunan tinggi digunakan sekarang karena lahan yang sudah mulai menyempit atau hampir habis dan jumlah permintaan akan ruang untuk beraktivitas yang bertambah. Earned value management (EVM) adalah sistem manajemen terkenal yang membahas mengenai biaya, jadwal dan kinerja teknis. Sistem EVM masih memiliki masalah dalam menghitung durasi maka muncul konsep earned schedule (ES). Permasalahan yang dibahas pada penelitian ini adalah apakah metode ES dapat digunakan untuk memprediksi durasi proyek bangunan tinggi. Tujuan dari penelitian ini adalah untuk memperoleh model perhitungan prediksi durasi dari model ini dapat dilihat apakah metode ES dapat digunakan untuk memprediksi durasi proyek bangunan tinggi. Prosedur analisis data melalui tahapan pengumpulan data durasi proyek nyata maupun berjalan dengan perhitungan metode ES, validasi data dengan metode uji selisih rata-rata, dan data dianalisis dengan pendekatan uji statistik yaitu uji t dan uji z. Hasil analisis menunjukkan bahwa uji T sebesar 0,663 (batas ±2,045) dan Uji Z sebesar 0,67121 (batas ±1,96), maka uji hipotesis H0 dapat diterima yang berarti perhitungan durasi dengan metode ES dapat digunakan untuk memprediksi durasi proyek bangunan tinggi.
OPTIMASI PENGGUNAAN EXCAVATOR DAN DUMP TRUCK PADA PROYEK X DENGAN METODE LINEAR PROGRAMMING Imanda, Krisna; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 4, November 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i4.30809

Abstract

The growth of construction projects in Indonesia demands efficient utilization of heavy equipment in infrastructure projects. One of the significant cost factors involves the use of heavy machinery such as Excavators and Dump Trucks. This study employs linear programming to optimize the usage of Excavators and Dump Trucks in a soil excavation project in Bogor. By minimizing the operational costs of heavy machinery, the research identifies the optimal number of equipment required to achieve the targeted volume of soil. The results indicate that employing the LP model with LINGO software significantly reduces project costs, saving approximately Rp368,445,800 per week compared to field costs. This research contributes to enhancing operational efficiency and reducing costs in construction projects through the optimization of heavy equipment utilization. The optimization of heavy equipment utilization in construction projects not only improves cost efficiency but also ensures the timely completion of projects within budget constraints. By leveraging mathematical models such as linear programming, this study demonstrates a practical approach to achieving these goals. The findings underscore the importance of strategic planning and efficient resource allocation in enhancing overall project performance and competitiveness in the construction industry. Abstrak Pertumbuhan industri konstruksi di Indonesia menuntut penggunaan alat berat yang efisien dalam proyek-proyek infrastruktur. Salah satu faktor biaya terbesar adalah penggunaan alat berat seperti excavator dan dump truck. Penelitian ini menggunakan pendekatan linear programming untuk mengoptimalkan penggunaan excavator dan dump truck dalam proyek penggalian tanah di Bogor. Dengan meminimalkan biaya operasional alat berat, studi ini berhasil mengidentifikasi penggunaan optimal alat berat yang diperlukan untuk mencapai volume tanah yang ditargetkan. Hasilnya menunjukkan bahwa penggunaan model linear programming dengan bantuan program LINGO dapat mengurangi biaya proyek secara signifikan, sekitar Rp368.445.800 per minggu, dibandingkan dengan biaya lapangan. Penelitian ini memberikan kontribusi dalam meningkatkan efisiensi operasional dan mengurangi biaya pada proyek konstruksi melalui optimasi penggunaan alat berat.
PENGARUH UKURAN BENDA UJI KUBUS TERHADAP NILAI KUAT TEKAN RECATIVE POWDER CONCRETE Kushartomo, Widodo; Sutandi, Arianti; Wijaya, Jevin
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 4, November 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i4.32035

Abstract

The testing of reactive powder concrete (RPC) in the laboratory aims to obtain compressive strength values that represent the quality of the concrete being tested. This testing must adhere to established standards, including international regulations such as ASTM (American Standard for Testing Materials), BS (British Standard), and national regulations like SNI. According to BS 1881 Part 108, the concrete samples must be cube-shaped with dimensions of 15 cm x 15 cm x 15 cm. For high-strength concrete such as RPC, it is impractical to use cylindrical specimens with a diameter of 15 cm and a height of 30 cm due to the maximum capacity of the compression testing machine. This study investigates the correlation between compressive strength for cube specimens of 5x5x5 cm³, 10x10x10 cm³, and 15x15x15 cm³. The target compressive strengths are set at K400, K500, and K650, with 10 samples produced for each size and strength class. Compressive strength tests were conducted at 28 days, with the samples cured through immersion in water at 25°C for 26 days. The results indicate that specimen size influences compressive strength values, with smaller specimens exhibiting higher compressive strengths. Conversely, larger specimens are more prone to defects, which may reduce the compressive strength. Abstrak Pengujian RPC di laboratorium bertujuan untuk mendapatkan nilai kuat tekan yang mewakili mutu dari beton yang diujikan. Pengujian harus mengikuti standar-standar yang telah ditentukan seperti bentuk dan ukuran yang  sesuai dengan peraturan internasional seperti ASTM (American Standart for Testing Materials), BS (British Standard), dan peraturan nasional yaitu SNI. Berdasarkan BS 1881 part 108 tentang sampel beton berbentuk kubus, mensyaratkan ukuran benda uji 15 cm x 15 cm x 15 cm. Pada beton dengan mutu sangat tinggi seperti RPC, tidak memungkinkan membuat benda uji silinder berukuran diameter 15 cm tinggi 30 cm, ini berkaitan dengan kapasitas maksimum mesin yang digunakan untuk melakukan pengujian tekan. Pada penelitian ini dicari korelasi kuat tekan ukuran kubus  5x5x5 cm3, 10x10x10 cm3 terhadap 15x15x15 cm3. Kuat tekan beton yang direncanakan K400, K500 dan K650, masing masing ukuran dan mutu benda uji dibuat sebanyak 10 buah. Pengujian benda uji kubus dilakukan pada umur 28 hari, pemeliharan dengan teknik perendaman dalam air bertemperatur 25oC selama 26 hari. Berdasarkan pengujian yang dilakukan ukuran benda uji mempengaruhi nilai kuat tekan, semakin kecil ukuran benda uji maka nilai kuat tekan yang ditunjukkan juga semakin besar. Semakin besar benda uji kubs yang digunakan, kemungkinan terjadinya cacat juga semakin besar.
ANALISIS CHANGE ORDER RATIO PADA PROYEK KONSTRUKSI RUMAH TINGGAL STUDI KASUS DI DAERAH TANGERANG Bataric, Rosani Surya; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 1, Februari 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i1.32602

Abstract

The construction industry plays an important role in economic growth, especially in infrastructure and housing. However, this industry is faced with various challenges, one of which is change orders that can hinder the smooth implementation of the project. Change order is a change in the provisions of the original contract document made in writing and documented between the project owner and the project implementer. These changes can have an impact on the price, project schedule, and schedule for contract payments. The purpose of this study is to analyze the magnitude of the change order ratio value and identify the causes of change orders based on job classification in a residential construction project. This research uses a case study of residential houses in the Tangerang area. Based on the results of research and calculation, the total value of change order ratio is 2.15%, for change order ratio in addition 1.60%, and change order ratio in subtraction 0.55%. Architectural and structural work which is the category of work with the largest change order impact on this residential construction project is one of the causes due to changes in the design of the building which causes changes in the volume of work. Abstrak Industri konstruksi memegang peranan penting dalam pertumbuhan ekonomi khususnya dalam bidang infrastruktur dan perumahan. Namun industri ini dihadapkan pada berbagai tantangan, salah satunya change order yang dapat menghambat kelancaran pelaksanaan proyek. Change order adalah perubahan ketentuan dokumen kontrak asli yang dibuat secara tertulis dan didokumentasikan antara pemilik proyek dan pelaksana proyek. Perubahan tersebut dapat berdampak pada harga, jadwal proyek, dan jadwal untuk pembayaran kontrak. Tujuan dari penelitian ini adalah untuk menganalisis besarnya nilai change order ratio dan mengidentifikasi penyebab terjadinya change order berdasarkan klasifikasi pekerjaan pada suatu proyek konstruksi rumah tinggal. Penelitian ini menggunakan studi kasus rumah tinggal di wilayah Tangerang. Berdasarkan hasil penelitian dan perhitungan, diperoleh nilai total change order ratio 2,15%, untuk change order ratio in addition 1,60%, dan change order ratio in subtraction 0,55%. Pekerjaan Arsitektur dan Struktur yang menjadi kategori pekerjaan dengan dampak change order terbesar pada proyek konstruksi rumah tinggal ini salah satu penyebabnya adalah karena adanya perubahan pada design bagunan yang menyebabkan adanya perubahan pada volume pekerjaan.
OPTIMALISASI BIAYA PEMBANGUNAN STRUKTUR DINDING PENAHAN TANAH DENGAN REVETMENT WALL SEBAGAI PERIMETER PERUMAHAN X Hauwendy, Hauwendy; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 1, Februari 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i1.32630

Abstract

In planning a project, the main reference aspects are costs, quality and time. A good project must have good and efficient planning and cost control, in order to obtain maximum profits without affecting the quality and time of project completion. The Cluster X housing development project in South Tangerang covers an area of 28 hectares with a planned development of 1200 houses targeted for completion in 2026. This housing has a perimeter of 4,67 km, which will be equipped with retaining walls and concrete panel fences as boundaries. This research seeks a more cost effective alternative to retaining walls. The retaining walls that have been planned by the consultant have varying dimensions depending on the construction location, one of which is type B5 with an overturning SF (Safety Factor) value of 14 ≥ 2, Shear SF 7 ≥ 1,5, Bearing Capacity 3 ≥ 3, and global stability SF 1,94 ≥ 1,5. Meanwhile, the second alternative is a revetment wall with a global SF Stability of 1,78 ≥ 1,5. The calculation results for perimeter construction costs of 1+000 to 1+500 require a cost of Rp. 2.411.851.650. Meanwhile, the second alternative costs Rp. 1.046.625.996. We will save construction costs by 45,61%. Abstrak Didalam perencanaan sebuah proyek, aspek acuan utama adalah aspek biaya, mutu dan waktu. Sebuah proyek yang baik harus memiliki perencanaan dan pengendalian biaya yang baik dan efisien, guna untuk mendapatkan keuntungan maksimal tanpa mempengaruhi mutu dan waktu penyelesaian proyek. Proyek pembangunan perumahan cluster X di Tangerang Selatan mencakup lahan seluas 28 hektar dengan rencana pembangunan 1200 rumah yang ditargetkan selesai pada tahun 2026. Perumahan ini memiliki perimeter sepanjang 4,67 km, yang akan dilengkapi dinding penahan tanah dan pagar panel beton sebagai pembatas. Penelitian ini mencari alternatif dinding penahan tanah yang lebih hemat biaya. Dinding penahan tanah yang sudah direncanakan oleh konsultan memiliki dimensi yang bervariasi tergantung lokasi konstruksi, salah satunya adalah tipe B5 dengan nilai SF (Safety Factor) Guling 14 ≥ 2, SF Geser 7 ≥ 1,5, Daya Dukung 3 ≥ 3, dan SF stabilitas global 1,94 ≥ 1,5. Sedangkan untuk alternatif kedua yaitu revetment wall dengan SF Stabilitas global 1,78 ≥ 1,5. Hasil perhitungan biaya konstruksi perimeter 1+000 sampai 1+500 memerlukan biaya sebesar Rp. 2.411.851.650. Sedangan kan untuk alternatif kedua memerlukan biaya sebesar Rp. 1.046.625.996. Dengan mengganti dinding penahan tanah menjadi revetment walls akan menghemat biaya konstruksi sebesar 45,61%.
PERBANDINGAN DAYA DUKUNG TIANG PANCANG BERDASARKAN UJI SONDIR DAN TES PDA DI PROYEK RUKO X Christina Veronica; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 1, Februari 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i1.32638

Abstract

The bearing capacity of pile foundations can be determined based on soil investigation results. Various methods can be used to assess the bearing capacity of piles. This study analyzes the bearing capacity of pile foundations in the X shophouse project in Tangerang City using CPT data and PDA test data. The calculation methods applied include the Meyerhof method, Schmertmann Nottingham (1975) method, and Tumay and Fakhroo method. The analysis results compare the end-bearing capacity, shaft friction capacity, and ultimate bearing capacity based on PDA and CPT tests. According to the calculations, the Schmertmann Nottingham (1975) method for pile number 254 achieved an accuracy level of up to 99% based on CPT calculations and PDA test results, with a Qu PDA value of 101.6 tons and a Schmertmann Nottingham (1975) method value of 100.17 tons. Meanwhile, for pile number 324, the Tumay and Fakhroo method showed an accuracy of 79%, with a Qu PDA value of 131.1 tons and a Tumay and Fakhroo method value of 102.8 tons. Abstrak Daya dukung tiang pancang dapat diperhitungkan dari hasil penyelidikan tanah. Terdapat berbagai metode yang dapat digunakan untuk mengetahui daya dukung tiang pancang. Penelitian ini menganalisis daya dukung tiang pancang pada proyek ruko X di daerah Tangerang Kota menggunakan data CPT dan data uji PDA. Metode perhitungan daya dukung tiang pancang yang digunakan antara lain adalah metode Meyerhoff, Schmertmann Nottingham (1975), dan Tumay and Fakhroo. Hasil analisis menunjukkan perbandingan daya dukung ujung tiang, daya dukung selimut tiang, serta daya dukung ultimit dari uji PDA dan CPT. Berdasarkan hasil perhitungan, metode Schmertmann Nottingham (1975) pada tiang dengan nomor 254 menunjukkan tingkat keakuratan hingga 99% berdasarkan perhitungan CPT dan hasil uji PDA, dengan nilai Qu PDA sebesar 101,6 ton dan metode Schmertmann Nottingham (1975) sebesar 100,17 ton. Sementara itu, pada tiang nomor 324, metode Tumay and Fakhroo menunjukkan keakuratan 79%, dengan nilai Qu PDA sebesar 131,1 ton dan metode Tumay and Fakhroo sebesar 102,8 ton.