ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK X DI SLIPI MENGGUNAKAN METODE RELATIVE IMPORTANCE INDEX (RII) Sukma, Jason Christian; Sandjaya, Arif
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 1, Februari 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i1.33263

Abstract

One of the important variables that determine the success of a construction project is the duration of said project. There are many factors that can negatively affect a project’s duration, from design to finishing, causing delays in the long term. This study aims to identify and determine the highest ranking of delay factors in a high-rise building project. In this study, data is obtained quantitatively by distributing questionnaires to the construction actors of Project X in Slipi, West Jakarta. Analysis of the data’s validity and reliability is conducted using the IBM SPSS (Statistical Package for the Social Sciences) software, and the significance of each variable is determined with the RII (Relative Importance Index) method using Microsoft Excel. 12 out of 20 variables in this study are deemed valid and reliable according to the analysis results. Out of those 12 factors, the highest ranking of delay factors in Project X is inadequate site management, with an RII score of 0.7292. Abstrak Salah satu variabel penting yang menentukan keberhasilan suatu proyek konstruksi adalah durasi dari pelaksanaan proyek tersebut. Terdapat banyak faktor yang dapat mempengaruhi durasi proyek secara negatif, mulai dari desain hingga penyelesaian, sehingga mengakibatkan keterlambatan dalam jangka panjang. Studi ini bertujuan untuk mengidentifikasi dan menentukan peringkat tertinggi faktor-faktor keterlambatan dalam proyek gedung bertingkat tinggi. Dalam studi ini, data diperoleh secara kuantitatif dengan menyebarkan kuesioner pada pelaku konstruksi Proyek X di Slipi, Jakarta Barat. Analisis terhadap validitas dan reliabilitas data dilakukan menggunakan perangkat lunak IBM SPSS (Statistical Package for the Social Sciences), dan signifikansi masing-masing variabel ditentukan dengan metode RII (relative importance index) menggunakan Microsoft Excel. 12 dari 20 variabel dalam studi ini dianggap valid dan reliabel berdasarkan hasil analisis. Dari 12 faktor tersebut, peringkat tertinggi dari faktor keterlambatan di Proyek X adalah site management yang kurang baik, dengan skor RII sebesar 0,7292.
IMPLEMENTASI REKAYASA NILAI PADA PEMILIHAN MATERIAL PENUTUP DINDING PROYEK RUMAH TINGGAL DI MUARA KARANG Sukma, Jason Christian; Oei, Fuk Jin
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 4, November 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i4.34387

Abstract

This study applies the value engineering method to determine the optimal wall material for a two-story residential project in Muara Karang, North Jakarta. In this study, high-cost work items were identified using a cost model and a Pareto Diagram. The primary focus of the analysis is on wall construction, one of the significant components influencing the overall cost of the project. The following wall material alternatives were evaluated using the Analytical Hierarchy Process (AHP) method: red brick, black pressed concrete block, and lightweight brick. The evaluation criteria include construction cost, material weight, fire resistance, and material durability within the long term. The results of the AHP analysis show that black pressed concrete blocks are the most efficient alternative, achieving the highest score and offering a cost saving of 13.23% compared to the initial design using red brick. Additionally, a Life Cycle Costing (LCC) analysis with a Net Present Value (NPV) approach was conducted, revealing minimal cost differences between the two proposed alternatives. Abstrak Penelitian ini menerapkan metode rekayasa nilai untuk menentukan material dinding yang optimal pada proyek rumah tinggal dua lantai di Muara Karang, Jakarta Utara. Dalam penelitian ini, item pekerjaan dengan kontribusi biaya tinggi diidentifikasi menggunakan cost model dan Diagram Pareto. Fokus utama dari analisis adalah pada pekerjaan dinding, salah satu komponen dengan pengaruh besar terhadap biaya keseluruhan proyek. Alternatif material dinding berikut dievaluasi menggunakan metode Analytical Hierarchy Process (AHP) pada penelitian ini: bata merah, batako hitam press, dan bata ringan. Kriteria evaluasi yang digunakan mencakup biaya konstruksi, berat material, ketahanan api, serta ketahanan material dalam jangka panjang. Hasil dari analisis AHP menunjukkan bahwa batako hitam press merupakan alternatif yang paling efisien, dengan memperoleh skor tertinggi dan menawarkan penghematan biaya sebesar 13,23% dibandingkan dengan desain awal yang menggunakan bata merah. Selain itu, dilakukan analisis Life Cycle Costing (LCC) dengan pendekatan Net Present Value (NPV), yang menghasilkan perbedaan biaya minim antara kedua alternatif yang ditawarkan.