Claim Missing Document
Check
Articles

Found 3 Documents
Search

Analisis Pengukuran Kondisi Lingkungan Kerja Pada Area Workshop dan Office di PT Duta Bara Utama, Kabupaten Muara Enim Wahyu Panggaran Pratama; Reni Arisanti; Aris Susilo
Blantika: Multidisciplinary Journal Vol. 3 No. 10 (2025): Special Issue
Publisher : PT. Publikasiku Academic Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57096/blantika.v3i10.430

Abstract

Lingkungan kerja yang tidak optimal pada industri pertambangan dapat menimbulkan berbagai risiko kesehatan dan keselamatan kerja. Berdasarkan observasi awal di PT Duta Bara Utama, teridentifikasi permasalahan terkait tingkat kebisingan, pencahayaan, dan aspek ergonomi yang belum memenuhi standar yang ditetapkan. Penelitian ini bertujuan untuk menganalisis kondisi lingkungan kerja di area workshop dan office PT DBU, meliputi aspek kebisingan, pencahayaan, ergonomi, dan identifikasi risiko kerja (HIRA). Hasil pengukuran menunjukkan tingkat kebisingan di sekitar genset mencapai 87,9 dB, melebihi ambang batas 85 dB. Intensitas pencahayaan di semua titik kerja juga berada di bawah standar 300 lux. Evaluasi ergonomi menunjukkan postur kerja yang tidak ideal dan penggunaan fasilitas kerja yang kurang sesuai. Penelitian ini juga melakukan penilaian HIRA dan menemukan berbagai potensi bahaya fisika, kimia, biologi, dan ergonomi, baik di area office maupun workshop. Untuk mengatasi permasalahan tersebut, perusahaan telah menerapkan beberapa upaya pengendalian, seperti penambahan pencahayaan, pemasangan peredam suara, rotasi kerja, dan penggunaan Alat Pelindung Diri (APD). Hasilnya, risiko kerja dapat ditekan dari tingkat tinggi menjadi rendah. Penelitian ini diharapkan menjadi acuan dalam peningkatan keselamatan dan kesehatan kerja di lingkungan tambang.
Analisis Produktivitas Excavator Komatsu PC 300 dan Dump Truck Hino 500 pada Penambangan Batubara di PT Priamanaya Energi Site Lahat Sumatera Selatan Selamet Kusrofi; Reni Arisanti; Dedi Yansen
Blantika: Multidisciplinary Journal Vol. 3 No. 10 (2025): Special Issue
Publisher : PT. Publikasiku Academic Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57096/blantika.v3i10.435

Abstract

This research was conducted at PT Priamanaya Energi, Lahat site, to analyze the productivity of a Komatsu PC 300 excavator and a Hino 500 dump truck. The method used was a quantitative descriptive approach, collecting primary data on equipment cycle time and haul distance, as well as secondary data on equipment specifications and mine conditions. The calculations showed that excavator productivity was 200.94 tons/hour and dump truck productivity was 34.25 tons/hour, with a work efficiency of 81%. The actual match factor of 0.89, in this context, is close to the equipment compatibility figure, meaning that the number of equipment used is sufficient to match the working speed of the excavator, thus eliminating queues and waiting times for the excavator. Four main factors influencing productivity are the conditions of the mining front area, road conditions, weather conditions, and operator/driver skills. This research provides technical recommendations to improve equipment compatibility and production effectiveness in the field.
Analisis Kebutuhan Alat Mekanis Batubara terhadap Target Produksi Bulan Mei-Juni 2024 PT Golden Great Borneo Kecamatan Merapi Timur Kabupaten Lahat Apri Robiyansa; Reni Arisanti; Ahmad Husni
Jurnal Global Ilmiah Vol. 2 No. 1 (2024): Jurnal Global Ilmiah
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/jgi.v2i1.128

Abstract

PT Golden Great Borneo adalah perusahaan yang bergerak di bidang pertambangan batubara, yang dihadapkan pada tantangan dalam mencapai target produksi yang optimal. Efisiensi alat mekanis, terutama alat angkut dan gali muat, menjadi faktor kunci dalam menunjang keberhasilan operasi penambangan. Penelitian ini bertujuan untuk menganalisis kebutuhan alat mekanis yang dibutuhkan dalam kegiatan penambangan batubara agar dapat mencapai target produksi yang telah ditetapkan pada bulan Mei-Juni 2024. Penelitian ini menggunakan metode analisis kuantitatif untuk mengukur produktivitas aktual alat gali muat dan alat angkut di PT Golden Great Borneo. Data dikumpulkan melalui observasi langsung di lapangan, termasuk pengukuran waktu edar, kapasitas angkut, dan tingkat efisiensi kerja alat mekanis. Teknik analisis melibatkan perhitungan produktivitas alat menggunakan formula produksi standar untuk alat angkut dan gali muat, serta analisis keserasian antara kedua alat tersebut. Hasil penelitian menunjukkan bahwa produktivitas aktual alat gali muat sebesar 113.523 ton per bulan dan alat angkut sebesar 151.370 ton per bulan, dengan tingkat pencapaian target produksi perusahaan sebesar 79% dan 91%. Analisis keserasian antara alat gali muat dan alat angkut menunjukkan nilai faktor keserasian sebesar 0,98 (MF < 1), yang mengindikasikan bahwa alat mekanis yang digunakan belum optimal dalam mendukung pencapaian target produksi. Kesimpulan dari penelitian ini adalah bahwa perencanaan dan analisis kebutuhan alat yang tepat sangat diperlukan untuk mencapai target produksi yang telah ditetapkan. Penambahan alat mekanis akan meningkatkan kapasitas produksi dan membantu PT. Golden Great Borneo mencapai target produksi bulanan.