Claim Missing Document
Check
Articles

Found 2 Documents
Search

EDUKASI BAHAYA LISTRIK DAN KEBAKARAN DI PANTI ASUHAN YAYASAN BAROKAH AMANAH MUSTAQBAL Rahayu, Siti; Rahardjo, Sugeng Budi; Windyatri, Hasyrani; Febrinasari, Tantry; Listyanto, Rudy Effendi
Jurnal Pengabdian Kolaborasi dan Inovasi IPTEKS Vol. 3 No. 1 (2025): Februari
Publisher : CV. Alina

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59407/jpki2.v3i1.1901

Abstract

Pengabdian ini adalah untuk meningkatkan kesadaran anak asuh tentang pentingnya penggunaan listrik yang aman dan tepat, dengan harapan dapat mengurangi resiko kebakaran yang disebabkan oleh bahaya listrik. Panti Asuhan Yayasan Barokah Amanah Mustaqbal merupakan panti di Karawang. Pengetahuan tentang penyelamatan diri saat terjadi kebakaran masih kurang, sehingga perlu dilaksanakan edukasi tentang penanganan bahaya listrik dan kebakaran. Hasil pelaksanaan kegiatan menunjukkan bahwa terjadi peningkatan pengetahuan anak-anak hingga pengurus panti mengerti tentang bahaya listrik dan kebakaran dan cara menghindari resiko kebakaran.
Analisa Usulan Perbaikan Tata Letak Fasilitas untuk Mengoptimalkan Proses Produksi pada CV. XYZ dengan Metode Systematic Layout Planning Ridwan, Muhamad; Intani, Arvita Emarilis; Listyanto, Rudy Effendi
JiTEKH Vol. 13 No. 1 (2025): March 2025
Publisher : Universitas Harapan Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35447/jitekh.v13i1.1130

Abstract

An efficient facility layout is crucial for improving productivity and operational efficiency, especially for Small and Medium Enterprises like CV. XYZ, which face space limitations and inefficient material flow. This study aims to redesign the facility layout using the Systematic Layout Planning (SLP) method to optimize material flow, reduce internal transportation, and enhance the competitiveness of CV. XYZ in the screen printing industry. A quantitative descriptive approach was employed, with data collected through observations, interviews, documentation, and literature review. The SLP stages include activity analysis, calculation of Material Handling Costs (MHC), creating a from-to chart, priority scale table, activity relationship chart, and layout simulation using Blocplan software. The results show that the proposed layout successfully reduced the distance between workstations, optimized the process flow, and decreased MHC by 7% or IDR 15,648.75. These changes enhanced production efficiency, minimized material handling time, and created a more organized and productive layout. By effectively redesigning the facility layout, CV. XYZ improved its operational efficiency.