Alethery, Abdulrahman Faisal Hezam
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PROJECT PLANNING OF THE CONSTRUCTION OF AK LABORATORY BUILDING STATE POLYTECHNIC OF MALANG Alethery, Abdulrahman Faisal Hezam; Suhariyanto, Suhariyanto; Sakti, Radhia Jatu Noviarsita
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 4 No. 4 (2023): DESEMBER 2023
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v4i4.3697

Abstract

The AK Laboratory Building at the State Polytechnic of Malang will function as a laboratory building and electrical engineering study program workshop building. This building has been built with one floor in the existing situation and will be rebuilt and planned to have 7 floors. In construction, especially laboratory buildings in the campus area requires optimal project planning to create projects that are effective, efficient, economical, and timely in the completion. Therefore, project planning is made in this thesis to obtain organized, and well-planned project. The AK Laboratory Building located at the State Polytechnic of Malang, in Malang City, East Java, Indonesia. The secondary data obtained are Detailed Engineering Drawings, Work Plan Documents, HSPK Malang City, Regulations and references from journals and books. In this thesis, the work reviewed is structural work starting from preparatory work, substructure work, and superstructure work starting from the 1st floor to the 7th floor and roof top. From the data collected, data processing is carried out in the form of determining Work Breakdown Structure, Organizational Structure, Project Site Installation, Strategy and Implementation Method, Implementation Schedule, Quality Control, Construction Safety Plan, and the Budget Plan. From data processing carried out, the general result is that the project implementation plan would last for 134 working days, with budget planning for the direct cost Rp 19.439.275.453,07 and the indirect cost is Rp 4.622.613.116,95, so that the total budgeted cost is Rp 24.061.888.570,02.