CLASH DETECTION ANALYSIS OF RSIA BUILDING CONSTRUCTION USING AUTODESK REVIT AND NAVISWORKS I Putu Ari Sanjaya; I Gusti Agung Adnyana Putera; Putu Ira Pramesti Wiraningsih; The Nikolaus Ferrer
Jurnal Ilmiah Teknik Sipil Vol. 29 No. 1 (2025): Jurnal Ilmiah Teknik Sipil, Vol. 29 No. 1, Maret 2025
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JITS.2024.v29.i01.p09

Abstract

Clashes between objects in construction projects often lead to delays, increased costs, and rework due to a lack of coordination between disciplines and the limitations of traditional clash detection technologies. This study evaluates the effectiveness of implementing clash detection based on Building Information Modeling (BIM) using Autodesk Revit and Navisworks in reducing rework, additional costs, and project duration. The research adopts a quantitative method using secondary data, including 3D models, time schedules, and Unit Price Analysis. The analysis identified a total of 964 clashes, consisting of 274 structure-MP clashes, 603 architectural-MP clashes, and 87 structure-architectural clashes. The implementation of clash detection resulted in a rework reduction of 0.34% and a total cost saving of 4.63%, which includes savings in structural work (0.08%), architectural work (7.76%), and mechanical-plumbing work (0.06%). Avoided rework includes the demolition of 4.93 m³ of concrete, 70.81 m² of walls, 1051.11 m² of ducting relayout, and 1.05 m of pipe relocation. Additionally, the potential time saving is estimated at 41.7 days or 7.79% of the total project duration.
CLASH DETECTION ANALYSIS OF RSIA BUILDING CONSTRUCTION USING AUTODESK REVIT AND NAVISWORKS I Putu Ari Sanjaya; I Gusti Agung Adnyana Putera; Putu Ira Pramesti Wiraningsih; The Nikolaus Ferrer
Jurnal Ilmiah Teknik Sipil Vol. 29 No. 1 (2025): Jurnal Ilmiah Teknik Sipil, Vol. 29 No. 1, Maret 2025
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JITS.2024.v29.i01.p09

Abstract

Clashes between objects in construction projects often lead to delays, increased costs, and rework due to a lack of coordination between disciplines and the limitations of traditional clash detection technologies. This study evaluates the effectiveness of implementing clash detection based on Building Information Modeling (BIM) using Autodesk Revit and Navisworks in reducing rework, additional costs, and project duration. The research adopts a quantitative method using secondary data, including 3D models, time schedules, and Unit Price Analysis. The analysis identified a total of 964 clashes, consisting of 274 structure-MP clashes, 603 architectural-MP clashes, and 87 structure-architectural clashes. The implementation of clash detection resulted in a rework reduction of 0.34% and a total cost saving of 4.63%, which includes savings in structural work (0.08%), architectural work (7.76%), and mechanical-plumbing work (0.06%). Avoided rework includes the demolition of 4.93 m³ of concrete, 70.81 m² of walls, 1051.11 m² of ducting relayout, and 1.05 m of pipe relocation. Additionally, the potential time saving is estimated at 41.7 days or 7.79% of the total project duration.
STUDY OF COMMUNITY BASED CONTRACT IMPLEMENTATION IN THE SCHOOL REVITALIZATION PROGRAM IN BANGLI REGENCY Putu Ira Pramesti Wiraningsih
Jurnal Ilmiah Teknik Sipil Vol. 30 No. 1 (2026): Vol. 30 No. 1 (2026): Jurnal Ilmiah Teknik Sipil
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JITS.2026.v30.i01.p06

Abstract

This study examines the implementation of Community Based Contracting (CBC) in a school infrastructure revitalization program in Bangli Regency. It aims to evaluate how the self-managed construction scheme impacts financial optimization, social participation, and managerial dynamics. Using a qualitative descriptive approach with case studies of two different schools, the study highlights the application of Value Engineering (VE) principles through the Contract Change Order (CCO) instrument. It found that the CBC method provided significant budget flexibility without changing the final nominal value of the work. Overruns on structural and architectural items were successfully rationalized, allowing for the reallocation of funds amounting to 12.42% to 19% of the contract value. Beyond technical efficiency, the CBC approach can foster a sense of ownership among stakeholders through their participation in design decision making and stimulate the local economy by leveraging local labor and material supply chains. However, the study found operational challenges, particularly the excessive workload experienced by teachers due to their dual roles as educators and project managers, in addition to the complexity of construction tax administration. Ultimately, this study concludes that although CBC is highly effective for holistic budget and facility optimization, further intensive technical and administrative assistance is needed to ensure that the primary tasks of educators in schools are not disrupted.
STUDY OF COMMUNITY BASED CONTRACT IMPLEMENTATION IN THE SCHOOL REVITALIZATION PROGRAM IN BANGLI REGENCY Putu Ira Pramesti Wiraningsih
Jurnal Ilmiah Teknik Sipil Vol. 30 No. 1 (2026): Vol. 30 No. 1 (2026): Jurnal Ilmiah Teknik Sipil
Publisher : Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JITS.2026.v30.i01.p06

Abstract

This study examines the implementation of Community Based Contracting (CBC) in a school infrastructure revitalization program in Bangli Regency. It aims to evaluate how the self-managed construction scheme impacts financial optimization, social participation, and managerial dynamics. Using a qualitative descriptive approach with case studies of two different schools, the study highlights the application of Value Engineering (VE) principles through the Contract Change Order (CCO) instrument. It found that the CBC method provided significant budget flexibility without changing the final nominal value of the work. Overruns on structural and architectural items were successfully rationalized, allowing for the reallocation of funds amounting to 12.42% to 19% of the contract value. Beyond technical efficiency, the CBC approach can foster a sense of ownership among stakeholders through their participation in design decision making and stimulate the local economy by leveraging local labor and material supply chains. However, the study found operational challenges, particularly the excessive workload experienced by teachers due to their dual roles as educators and project managers, in addition to the complexity of construction tax administration. Ultimately, this study concludes that although CBC is highly effective for holistic budget and facility optimization, further intensive technical and administrative assistance is needed to ensure that the primary tasks of educators in schools are not disrupted.