Claim Missing Document
Check
Articles

Found 1 Documents
Search

Productivity Analysis Of Supply Chain Management Performance On Building Construction For Time Efficiency (Case Study Of RSHS Bandung Project) Andriansyah, Andra; Saputra, Nendang; Anamy, Muhammad Zakaria; Rozy, Nikko
Equivalent: Jurnal Ilmiah Sosial Teknik Vol. 7 No. 1 (2025): Equivalent: Jurnal Ilmiah Sosial Teknik
Publisher : Politeknik Siber Cerdika Internasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59261/jequi.v7i1.216

Abstract

This research can be a reference for other project management who want to implement supply chain management. Supply chain management is one of the important things in a construction project where the application of supply chain management will affect the success of a construction project both material management, type of work, and time schedule. Therefore, this study aims to reduce the risk of time losses and the effect of productivity performance on a project. By using a quantitative method that reviews the s-curve and distributes questionnaires, this study shows that the total deviation is 171.62 which results in an average deviation of 3.502 per week. Stating that the deviation results in a deviation of sure + and after conducting validity, reliability and satisfaction tests, the results show that supply chain management can accelerate and streamline time on building construction projects.