This Author published in this journals
All Journal Jurnal Surya Teknika
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Waktu Standar Produksi dengan Stopwatch Time Study Guna Penentuan Jumlah Tenaga Kerja Alfan, Alfan Ridho; Putri, Erni Puspanantasari
JURNAL SURYA TEKNIKA Vol. 12 No. 1 (2025): JURNAL SURYA TEKNIKA
Publisher : Fakultas Teknik UMRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37859/jst.v12i1.9379

Abstract

UD Logam Abadi is a manufacturing company that produces accessories for PLN and Telkom, one of which is the Suspensen Q spare part. The company is experiencing difficulties due to the lack of a standard working time, resulting in workers not having daily targets, which impacts the achievement of production volume. Fluctuating market demand and the manual assembly process make the role of labor very important. This research aims to determine the standard production time and the optimal number of workers using the Stopwatch Time Study method. The research results indicate that the standard time to complete one unit of Suspensen Q is 550.49 seconds or about 9.16 minutes. The optimal number of workers needed is 2 to 3 per division.