Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisa Keekonomian Pada Proyek Injeksi Surfaktan Sumur 04 Lapangan Delima Dengan Menggunakan Psc Cost Recovery Erika Maulina; Firdaus; Eka Megawati; Ali Muchammad; Abdi Suprayitno; Kartika Choriah; Darmiyati, Iin
AL-MIKRAJ Jurnal Studi Islam dan Humaniora Vol. 3 No. 2 (2023): Al-Mikraj, Jurnal Studi Islam dan Humaniora
Publisher : Pascasarjana Institut Agama Islam Sunan Giri Ponorogo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37680/almikraj.v3i2.7159

Abstract

The role of fossil energy such as oil, natural gas, and coal in various economic activities is currently irreplaceable and has become a major need for the Indonesian people. The increasing needs of the community are sometimes not proportional to the results of the amount of production, as happened at Well 04 in the Delima Field, need surfactant injection because the production flow rate is decreasing. The purpose of conducting an economic analysis on this surfactant injection project is to detrmine whether choosing a surfactant injection method will produce appropriate profits. The system used in this economic analysis is PSC Cost Recovery using economic indicators NPV, IRR, POT, and Benefit to Cost. For sensitivity analysis using NPV Contractor, IRR Contractor, Contractor Take, and Government Take. Based on the results of calculations that have been carried out, the net profit value received by the contractor is 13.359.765 US$ and that received by the government is 16.420.258 US$. While the results of the sensitivity analysis that has been carried out, it is known that the most influential parameters are cumulative production and oil prices which are directly proportional.
Pemindahan Arsip Inaktif di Sekretariat Daerah Provinsi Jawa Tengah (Studi Kasus: Keterbatasan Fasilitas Records Center) Erika Maulina; Jazimatul Husna
Information Science and Library Vol. 6 No. 2 (2025): Desember
Publisher : UPT Perpustakaan Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/jisl.v6i2.12552

Abstract

Penelitian ini bertujuan untuk menganalisis keterbatasan fasilitas Records Center terhadap proses pemindahan arsip inaktif di Sekretariat Daerah Provinsi Jawa Tengah. Pengelolaan arsip inaktif menjadi bagian penting dari penyusutan arsip dinamis yang bertujuan menjaga ketertiban administrasi dan efisiensi ruang kerja. Pendekatan kualitatif dengan metode studi kasus digunakan dalam penelitian ini, dengan teknik pengumpulan data melalui observasi, wawancara mendalam, dan dokumentasi. Hasil penelitian menunjukkan bahwa keberadaan dua Records Center telah mendukung proses penyusutan arsip, namun keterbatasan kapasitas ruang pada Records Center yang berada di dalam lingkungan kantor menjadi tantangan utama dalam proses pemindahan arsip. Proses pemindahan dilakukan secara bertahap dan terkoordinasi, menyesuaikan dengan kondisi fasilitas yang tersedia. Penyesuaian prosedur dan strategi pengelolaan berbasis kolaborasi antarunit kerja menjadi kunci untuk menjaga efektivitas pengelolaan arsip inaktif. Meskipun terdapat keterbatasan, pelaksanaan penyusutan arsip tetap berjalan sesuai kebijakan dan peraturan kearsipan yang berlaku. Kata kunci: Records Cente; Arsip Inaktif; Pemindahan Arsip; Keterbatasan Fasilitas; Sekretariat Daerah