Value Engineering Analysis of Architectural Works in Construction Projects (Case Study of Citra Arafiq Serang Hospital Development) Maddeppungeng, Andi; Asyiah, Siti; Intari, Dwi Esti; Setiawati, Dwi Novi; Damanik, Mariana Feronica; Rizky, Eky Muhammad
Jurnal Fondasi Vol 13, No 2 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v13i2.32724

Abstract

The development of construction projects cannot be separated from project control management, one of which is construction cost management. In its implementation, there are many problems that cause cost overruns. The objectives of this research are to identify architectural work components that have the potential to be value engineered, to determine the difference in project costs before and after value engineering is applied, and to determine the project cost efficiency obtained after the application of value engineering. The research method used in this research is Value Engineering Work Plan which consists of information stage, function analysis stage, creative stage, evaluation stage, development stage, and recommendation stage. Life Cycle Cost (LCC) analysis and Analytical Hierarchy Process (AHP) method were used to determine the value of work efficiency. From the results of the research, it was found that walls, partitions, ceilings, and floors are architectural work items that can be applied to VE Analysis. The cost difference from the results of replacing the initial design with the recommended design, obtained a total cost savings of Rp 2.454.714.553,78 from the total cost of architectural work of Rp 11.178.625.221,13.
Analysis of Time and Cost Acceleration with Crashing Method on Apartment Construction Project in Bekasi City Maddeppungeng, Andi; Asyiah, Siti; Intari, Dwi Esti; Ujianto, Rifky; Damanik, Mariana Feronica; Ashidiq, Alifian Taufiq
Jurnal Fondasi Vol 13, No 2 (2024)
Publisher : JURUSAN TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v13i2.32711

Abstract

In the implementation of construction projects, problems are often found, such as delays. One of the solutions is by accelerating. Acceleration is not only done to overcome delays, but can also be done if there is a special request from the owner. This study discusses the acceleration of time and cost using the crashing method in an apartment construction project in Bekasi City, which aims to determine the optimal time and cost of the three alternatives used. The work that is accelerated is some structural work that is on the critical path. Acceleration is carried out with three alternatives, namely the addition of working hours, the addition of labor, and the combination of additional working hours and additional labor. The results showed that with the alternative of adding working hours, the implementation time was 298 days at a cost of Rp. 140,751,032,332, obtaining a time efficiency of 5.7% and a cost efficiency of 0.42%. With the alternative of adding labor, the implementation time is 292 days at a cost of Rp. 140,092,976,595, 7.59% time efficiency and 0.89% cost efficiency are obtained. With the alternative of adding working hours and additional labor, the implementation time is 290 days at a cost of Rp. 139,912,527,724, 8.23% time efficiency and 1.02% cost efficiency are obtained. Then it can be concluded that the alternative with the most optimal time and cost is the combined alternative of adding working hours and adding labor.