Claim Missing Document
Check
Articles

Found 2 Documents
Search

Inventory Analysis Using The ABC, VEN and EOQ Methods For Procurement Budget Efficiency Medicine at Tritya Eye Clinic Surabaya Bima Ardiyanto Wibowo; Ulfi Pristiana; Esti Hari Prastiwi
Management Dynamics: International Journal of Management and Digital Sciences Vol. 2 No. 3 (2025): International Journal of Management and Digital Sciences
Publisher : International Forum of Researchers and Lecturers

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70062/managementdynamics.v2i3.308

Abstract

Efficient drug inventory management is a critical factor in ensuring medicine availability and optimizing procurement budgets in healthcare facilities. This study aims to analyze drug inventory at Tritya Eye Clinic Surabaya using the ABC (Always, Better, Control), VEN (Vital, Essential, Non-Essential), and EOQ (Economic Order Quantity) methods to improve procurement budget efficiency. A quantitative descriptive approach with a case study method was employed. Data were collected from drug usage records, stock opname reports, and procurement documents from in 2024. The findings reveal that the combined ABC-VEN method effectively identifies priority drug groups based on consumption value and clinical importance, while the EOQ method determines optimal ordering quantities to minimize total inventory costs. The integrated application of these methods successfully reduces overstock and stockout incidents and enhances procurement budget efficiency. This study recommends inventory management based on historical usage data and strategic classification to achieve more accurate and cost-effective drug procurement planning.
Analyzing the Operational Performance of Ro-Ro Terminals Using Vessel and Vehicle Queue Time Indicators: A Case Study at Tanjung Perak Port, Surabaya Erwan Khanissuma; Ulfi Pristiana; Esti Hari Prastiwi
Global Economics: International Journal of Economic, Social and Development Sciences Vol. 2 No. 2 (2025): June: Global Economics - International Journal of Economic, Social and Developm
Publisher : International Forum of Researchers and Lecturers

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70062/globaleconomics.v2i2.285

Abstract

The rapid increase in Ro-Ro (Roll-On/Roll-Off) vessel and vehicle traffic at Tanjung Perak Port, Surabaya, has exposed critical inefficiencies in port operations, particularly at key berths such as Jamrud Utara and Jamrud Selatan. These inefficiencies manifest as prolonged queuing times for Ro-Ro vessels and land-based vehicle congestion, leading to delays in cargo handling and increased operational costs. This study aims to evaluate the operational performance of Ro-Ro terminals based on queue time indicators for both Ro-Ro vessels and vehicles. Employing a quantitative descriptive approach, the research integrates the M/M/c queuing model and Fishbone Diagram analysis to identify systemic causes of operational delays and overcapacity. The study reveals that berth utilization rates exceed 75%, indicating saturation, while limited buffer zones and disorganized traffic flow exacerbate vehicle queues. As a case study, the findings offer data-driven insights and practical recommendations, including schedule optimization, dedicated traffic lanes, and infrastructural upgrades to mitigate congestion. The proposed framework not only enhances service efficiency at the port but also contributes to broader logistics performance in Eastern Indonesia. By combining classical queuing theory with root cause analysis, this research introduces a methodological synergy that can be replicated across other Ro-Ro terminals facing similar challenges. The findings underscore the urgent need for integrated port traffic management and infrastructural adaptability in response to growing maritime logistics demands.