Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISA DAMPAK POLUSI UDARA DAN SUARA DARI PEMBANGUNAN RUSUN BRIMOB DEN C PELOPOR CIPUTAT Hutagaol, Kerlima; Angga Permana Pasya; Aji Wibowo Kurniawan; Ichwan Wahyudi; Sumadulloh, Sumadulloh
Journal of Innovation Research and Knowledge Vol. 5 No. 3: Agustus 2025
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pembangunan gedung apartemen, seperti Rusun Brimob Den C Pelopor di Ciputat, Tangerang Selatan, dapat menimbulkan berbagai efek terhadap lingkungan di sekitar proyek dan komunitas sekitarnya. Penelitian ini mempunyai maksud dan tujuan agar dapat mengetahui sebab akibat dari kegiatan proyek terhadap lingkungan sekitar. Pendekatan yang digunakan adalah deskriptif dengan metode kualitatif. Informasi utama dikumpulkan dengan cara mengamati secara langsung dan mewawancarai seperti memberi quisioner para pekerja proyek serta masyarakat sekitar. Dan dari hasil obervasi ditemukan adanya efek terhadap lingkungan sekitar terutama efek polusi udara dan suara (kebisingan). walaupun, penanganan dari polusi udara dan suara tersebut sudah diterapkan dengan adanya manajemen lalu lintas alat berat. Sehingga membuat penanganan dari polusi udara dan suara tersebut tidak sampai merugikan atau menganggu para pekerja proyek serta masyarakat di komplek brimob.
ANALISIS OPTIMALISASI INTEGRASI BIM (TEKLA STRUCTURES) UNTUK DESAIN CIVIL STRUCTURAL DAN KOORDINASI PADA PROYEK EPC OIL & GAS Manurung, Edison Hatoguan; Sumadulloh, Sumadulloh
SINERGI : Jurnal Riset Ilmiah Vol. 3 No. 1 (2026): SINERGI : Jurnal Riset Ilmiah, January 2026
Publisher : Lembaga Pendidikan dan Penelitian Manggala Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62335/sinergi.v3i1.2294

Abstract

the integration of Tekla structural models with plant design platforms such as AVEVA E3D and Intergraph Smart 3D (SP3D), along with model federation in Autodesk Navisworks, is employed to facilitate clash detection, staged 30–60–90% model reviews, and multidisciplinary decision‑making. The study adopts a descriptive research design using a literature review approach, complemented by the author’s reflective experience as a civil–structural Tekla Designer during the DED phase, to formulate a conceptual BIM integration model within the framework of a Common Data Environment (CDE), ISO 19650 standards, and Level of Development (LOD). The findings suggest that consistent LOD definition, robust information governance in the CDE, disciplined management of clash tests in Navisworks, and a structured 30–60–90% model review scheme are critical in improving multidisciplinary coordination and reducing rework during DED. The proposed conceptual model is expected to provide an initial reference for practitioners and academics in designing BIM‑based workflows for Tekla–E3D/SP3D–Navisworks integration in EPC oil and gas projects.