Claim Missing Document
Check
Articles

Found 1 Documents
Search

RENCANA TEKNIS REKLAMASI TAHAP OPERASI PRODUKSI DAN NILAI EKONOMI PADA PERENCANAAN TAMBANG BATU ANDESIT DI DESA SIDOMULYO, KEC. PENGASIH, KAB. KULON PROGO, D.I. YOGYAKARTA Putera, Muhammad Arifian Dharma; Lusantono, Oktarian Wisnu; Primaniyarta, Fernanda; Faa’iz, Firman Agna Nur
Jurnal Administrative Reform Vol 13, No 1 (2025): JURNAL ADMINISTRATIVE REFORM
Publisher : Magister Administrasi Publik FISIP Universitas Mulawarman

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30872/jar.v13i1.18518

Abstract

This study focuses on the reclamation planning for an andesite mining site in Sidomulyo Village, Kulon Progo, Yogyakarta. Using the Quarry Sidehill method, the project spans 21.5 hectares of mining land with a six-year operational period (2025–2030). Reclamation activities include land arrangement, topsoil spreading, drainage, and revegetation with sengon and teak trees, as well as kalopo plants for cover crops. The total reclamation cost is estimated at IDR 2.113 billion, comprising land management and revegetation costs. This plan aims to restore land functionality and promote sustainable environmental stewardship while supporting government and industry initiatives.