Factor Analysis Of Factors Causing Delays In EPC Projects Using Dmaic And Alternative Solutions Chrishardiyan, Febri; Imaroh, Tukhas Shilul
Jurnal Ekonomi Teknologi dan Bisnis (JETBIS) Vol. 2 No. 5 (2023): Jurnal Ekonomi, Teknologi dan Bisnis
Publisher : Al-Makki Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57185/jetbis.v2i5.56

Abstract

The development of the construction world today, especially in EPC (Engineering, Procurement and Construction) project work is very rapid and complex. So the level of difficulty and the potential for delays is quite large. From data taken at one of the EPC divisions of construction companies in Jakarta in March 2023, there are 9 projects that experience delays from 10 existing projects. So the purpose of this study is to identify and analyze the main factors causing delays in completing EPC projects as well as alternative completion. In achieving good project time performance, it requires the support of resources (Man, Material, Machine, Money, Method) that are owned efficiently from the input process to the output. The method used in this study is DMAIC (Define, Measure, Analyze, Improve & Control) where analysis is carried out using Fishbbone, 5W + 1H Brainstorming and Pareto Diagram. The main factors causing delays in EPC project work are lack of material supply, lack of manpower, late material arrival schedule, damage or loss of materials, lack of experts and design errors during planning. Alternatives to solving EPC project delays are first submitting an EOT (Extention of Time), adding man power, evaluating schedules, monitoring the implementation of engineering designs, and collaborating with consultants who are more experienced in the EPC field so that there are no planning design errors and implementation methods.
STRATEGI REBRANDING WARTEG MENJADI MULTI OUTLET DAN MOBILE BISNIS (WARTEG KELILING) Chrishardiyan, Febri; Pane, Monika Sarananta; Pambudi, Ghanindo Rachmat; Fachruroji, Addien; Santoso, Sugeng
Narada : Jurnal Desain dan Seni Vol 9, No 1 (2022)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/narada.2022.v9.i1.010

Abstract

The transformation carried out in the warteg operating system (Warung Tegal) is one strategy in improving brand image and business mobility. The method used in this study is a case study using both a quantitative and qualitative approach. A data acquisition method using questionnaires and observations. The findings of this rebranding strategy have changed the brand image of warteg, which was originally a food that was easily displayed on traditional stalls, to stalls with better service standards, ordering options, general operation and quality. You can upgrade to. Permanent sales systems are also developed with mobile / mobile systems that use specially modified vehicles to move to crowded places and homes on a specific schedule and move beyond staying there. As the Warteg brand image grows, it is expected to help Warung tegal economists and users of the Waring brand increase sales in the competition in the culinary industry. The analytical tool used in this study was the logit model (Wald test), and the results of this study showed that the hypothetical results in the logit model reached 71.1% of the total.