Claim Missing Document
Check
Articles

Found 1 Documents
Search

PERANCANGAN PEMELIHARAAN POMPA AIR DI KAMPUS POLMAN BABEL MENGGUNAKAN METODE CONDITION-BASED MONITORING Iwan Putra, Nadi; Pramono, Edi; Feriadi, Indra; Rivai, Muhammad
Prosiding Seminar Nasional Inovasi Teknologi Terapan Vol. 4 (2024): Prosiding Seminar Nasional Inovasi Teknologi Terapan
Publisher : Politeknik Manufaktur Negeri Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Every time a water pump breaks down on the Polmanbabel Campus, it disrupts the smooth operation and service to employees and students. This project aims to design pump maintenance on the Polmanbabel campus using a condition-based monitoring (CBM) method. The project implementation method is carried out by identifying equipment, selecting condition parameters to be monitored, designing monitoring cards, and testing. The test results show that the monitored pump condition parameters consist of temperature, vibration, pressure, monitoring card instruments can be applied effectively to monitor pump operating conditions.