PEMODELAN REGRESI LINIER BERGANDA DAN ESTIMASI BIAYA PERBAIKAN LERENG MENGGUNAKAN SOIL NAILING (STUDI KASUS : JALAN MUARA ENIM – SP. SUGIHWARAS) Juliantina, Ika; Sutejo, Yulindasari; Butarbutar, Samuel; Agustien, Melawaty; Adhitya, Bimo Brata; Alia, Febrinasti
CANTILEVER Vol 6, No 2 (2017): Cantilever
Publisher : Jurusan Teknik Sipil & Perencanaan Fakultas Teknik Universitas Sriwijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (335.428 KB)

Abstract

Muara Enim road segment SP. Sugihwaras very potential to occur landslide based on its location which is on the edge of the river. Recorded by the National Road Implementation Institute (BBPJN) III has been a slope grid in 2014. Slope improvement efforts undertaken by the Ministry of Public Works using a combination of gabion not too successfully overcome the problem. In addition to the strength element of a construction work, the cost and timing of the implementation are also important considerations in planning. Slope at 173 + 535 - Km 173 + 705 along 170 m using soil nailing planned three nails with 19 mmnail diameter and angular slope of 20° with variation of nail length, nail installation spacing, safety factor (SF) and estimated working time to the cost. Using the SPSS.16.0 program, the variations are modeled by nine samples as multiple linear regression equations. Based on the SPSS output, then tested the classical assumption and feasibility test model which produced the model: Cost (million) = - 3159,475 - 54,097 length - 1354,256 distance + 5188,127 SF + 26,483 time. The Budget Plan (RAB) covers preparatory work, drainage system, soil nailing, and shotcrete. An efficient cost estimate of 8 m length nail, 1.5m installation distance, 1.5 safety factor and 64-day working time resulted in a cost of Rp. 3.853.485.500,00 (Three billion eight hundred fifty three million four hundred eighty five thousand rupiah).
PERENCANAAN KOLAM RETENSI UNTUK PENGENDALIAN BANJIR DI RSMH KOTA PALEMBANG Rhaptyalyani, Rhaptyalyani; Ilmiaty, Reini Silvia; Alia, Febrinasti
CANTILEVER Vol 7, No 1 (2018): Cantilever
Publisher : Jurusan Teknik Sipil & Perencanaan Fakultas Teknik Universitas Sriwijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (526.29 KB)

Abstract

Mohammad Hoesin general hospital (RSMH) is a public hospital owned by the Government of Palembang located at Jl. Sudirman . It is located in a densely populated area with total built area of ± 20 ha. The absence of adequate infiltration area plus improper drainage condition and capacity caused floods as high as ± 30 cm in the parking lot which is at the lowest elevation. In order to overcome these problems, RSMH took the initiative to build a retention pond. This study aims to analyze the feasibility of retention pond development plan along with its drainage network through the duflow modeling studio (DMS) approach and spatial analysis of Geographic Information System (GIS). Total catchment for the study area covers the area of ± 46 Ha with the maximum runoff discharge obtained from the modeling results Q = 0,2 m3/s while the waste water effluent that is discharged into the drainage channel Q = 0,0021 m3/s is not too significant therefore can be ignored. Capacity of retention pond with minimum area of 0,7 Ha is sufficient to serve the catchment area, but it should be considered the use of pumps with a capacity of at least 150 lt/s to overcome high elevation difference.