Noviansyah, Denny
Unknown Affiliation

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Model Green Logistik Pada Proses Industri Dan Penggunaan Produk (LPPU) Di Industri Semen Untuk Menurunkan Emisi Karbon Dioksida Noviansyah, Denny; Mada, Danie Hayam; Sholihah, Sita Aniisah; Arifa’i, Achmad Muhyidin; Yasir, Angel Farahnia
Jurnal Sistem Transportasi & Logistik Vol. 4 No. 1 (2024): Agustus
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v4i1.2409

Abstract

In the current development of globalization, one of the industrial sectors that continues to grow every year is the cement industry because cement is the main material in the construction process. Research institutions state that cement contributes around 8% of the world's carbon dioxide (CO2) emissions and the largest comes from industrial processes and product use (IPPU) so that the concept of environmentally friendly logistics can be implemented to reduce CO2 emissions. This study uses the Dynamic System method. The results of the study show that the use of alternative raw materials and alternative fuels can reduce CO2 emissions generated from the cement production process. This is evidenced by the results of the first scenario, namely Business as Usual, which is 334.90 KgCO2, then decreased by 38.2% or to 207.02 KgCO2 in the second scenario, namely the use of alternative raw materials, and in the third scenario, namely the use of alternative fuels, it also decreased by 68.9% or to 100.88 KgCO2.
Analisis Pengelolaan Tata Letak Gudang Pada Perusahaan (Third Party Logistik) Dengan Metode Sistem Layout Planning (SLP) Dzaky, Muhammad Naufal; Rizaldy, Wynd; Yulianto, Yuda; Puspita, Sesaria Mardhiani Rachma; Noviansyah, Denny
Jurnal Sistem Transportasi & Logistik Vol. 3 No. 2 (2023): December
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v3i2.2433

Abstract

PT. X is a company engaged in logistics, especially as a third party that provides services in the form of warehouse rental. As well as storage warehouses that are used to accommodate new goods from vendors to overcome all logistics in shipping goods. Based on the analysis carried out directly at the warehouse location, it was found that there was a problem regarding the accumulation of goods that came in the staging area , due to the location of forklift storage that was far from the location in the warehouse to the proposal to minimize material handling costs. With these problems, an analysis of the layout proposal based on data was carried out using the System Layout Planning (SLP) method, the result of the proposal was aimed at minimizing the costs incurred by the company and reducing the distance in the material handling flow. In this case, the calculation using System Layout Planning (SLP) obtained the results of changes regarding material handling costs, the change was initially Rp. 2,612,245 and the proposed material handling cost saved Rp. 559,251 to Rp.2,052. 994 and for the distance obtained the result After the implementation of the proposed layout, the material displacement flow distance / week was 23065m from the initial layout of 25326m and there was a difference of 2,261m. With the implementation of these changes, researchers hope that companies can achieve better operational efficiency and optimize the use of existing resources.
Rancangan Perbaikan Tata Letak Tool Storage Dengan Metode CBS Pada PT. IPP Suryobuwono, Abdullah Ade; Noviansyah, Denny; Puspita, Sesaria Maedhiani Rachma; Herlangga, Harya
Jurnal Sistem Transportasi & Logistik Vol. 3 No. 2 (2023): December
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v3i2.2434

Abstract

This research aims to determine, analyze and improve the layout of the storage warehouse at PT. IPP using the Class Based Storage Method. Materials that move quickly or are fast moving are stored close to the loading/unloading door to minimize material transportation distance. Company PT. IPP operates in the field of maintenance, repair and overhaul (MRO) services. The cause of the inefficient layout of goods in the warehouse is because there are no employees dedicated to the warehouse section so that the placement of goods becomes irregular. Based on the research, the results of the ABC classification in this study obtained three groups, namely where goods with a faster frequency of moving in and out were classified into group A, then goods which moved quickly but were not too close to the door were clarified into group B and items whose movements slow and far from the exit are classified as group C, clarification according to the frequency of material handling movement distance. After making a proposed warehouse layout, the results were able to minimize the distance moved during material handling in the initial warehouse layout of 7,033/month to a smaller value, namely 3,460/month. So it can be concluded that the Class Based Storage Method can be applied in companies so that the warehouse layout becomes more efficient.