Claim Missing Document
Check
Articles

Found 3 Documents
Search

Manajemen Resiko Terkait Keselamatan Dan Kesehatan Dalam Proyek Konstruksi Pranoto, Hari
Innovative: Journal Of Social Science Research Vol. 4 No. 3 (2024): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v4i3.10745

Abstract

Keselamatan dan Kesehatan Kerja (K3) merupakan hal yang sangat penting bagi perusahaan yang memiliki resiko kecelakaan kerja tinggi, khususnya perusahaan yang berkaitan dengan pekerjaan konstruksi. Penelitian ini bertujuan untuk mengetahui manajemen resiko terkait keselamatan dan kesehatan dalam proyek konstruksi. Metode penelitian ini berdasarkan tinjauan pustaka yang membahas tentang identifikasi risiko keselamatan dan kesehatan kerja dalam proyek. Hasil penelitian menunjukkan jika manajemen risiko terkait kesehatan dan keselamatan dalam proyek konstruksi merupakan aspek yang krusial untuk melindungi pekerja dan mengurangi risiko kecelakaan serta penyakit terkait dengan aktivitas pekerjaan. Identifikasi risiko yang komprehensif, evaluasi dampak dan probabilitas, serta pencegahan yang efektif melalui pengendalian risiko, pelatihan pekerja, dan pengawasan yang ketat adalah langkah-langkah kunci dalam menciptakan lingkungan kerja yang aman. Komunikasi yang baik antara manajemen, kontraktor, dan pekerja, serta pemantauan dan evaluasi terus-menerus, membantu memastikan implementasi tindakan pencegahan yang efektif. Dengan pendekatan holistik ini, proyek konstruksi dapat dilaksanakan dengan lebih aman, mendukung kesejahteraan pekerja, dan mengurangi risiko terkait dengan kesehatan dan keselamatan
PERLINDUNGAN HUKUM BAGI KONTRAKTOR DALAM KONTRAK KERJA KONSTRUKSI AKIBAT TERJADINYA KEADAAN KAHAR DI BANYUWANGI Pranoto, Hari; Pasaribu, Agnes; Mulyanto, Rudi
JURNAL AMAR Vol 1 No 1 (2023): AMAR - JURNAL HUKUM
Publisher : Fakultas Hukum Universitas 17 Agustus 1945 Banyuwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Legal Protection For Contractors In Constuction Working Contracts Due To Force Majeure In Banyuwangi Regency. The study discusses legal protection in contruction work contracts at the stage of contract implementation when force majeure occurs. The problem in this research is how the legal protection for contraktors in contruktion work contracts due to force majeure. In writing this thesis the author uses empirical research methods, where data obtained from the field is analyzed to be used as a basis for discussion to minimize the risk of force najeure in construction work contract,especially on the part of service providers (contractors). By interviewing the executives or directors of CV who have experienced force majeure on the work contract of a project that they have implemented. The results of the study concluded that the employment contract arrangement of construction work is able to reduce the emergence of claims and prevent construction disputes, especially for the contractors. The concept of the approach with Law No. 2 of 2017 Concerning Construction Services and Presidential Regulation No. 16 of 2018 Concerning Government Procurement of Goods/Services. The implication of this researchin that the parties, both service users and service providers (contractors) should pay attention to the clauses governing force majeure contained in the contract. With the aim that all parties can solve the problem properly. Thus, the contract that concerned from the beginning can determine the choice of dispute resolution or problems that are considered best for the parties, especially the contractor.
RESPON PERAMBATAN TERMAL TRANSIEN PADA MATERIAL DINDING BANGUNAN DENGAN VARIASI KETEBALAN MENGGUNAKAN METODE BEDA HINGGA IMPLIS Pratama, Ananta Kusuma Yoga; Pranoto, Hari
Jurnal Fisika : Fisika Sains dan Aplikasinya Vol 11 No 1 (2026): Jurnal Fisika : Fisika Sains dan Aplikasinya
Publisher : Universitas Nusa Cendana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35508/fisa.v11i1.27378

Abstract

Penelitian ini menganalisis perpindahan panas konduksi satu dimensi secara transien pada dinding bangunan yang dikenai pembebanan suhu permukaan luar akibat radiasi matahari menggunakan pendekatan numerik berbasis persamaan panas. Persamaan panas satu dimensi diselesaikan dengan metode beda hingga menggunakan skema implisit Backward Time–Central Space (BTCS) untuk menjamin stabilitas numerik pada simulasi waktu yang relatif panjang. Tiga jenis material dinding, yaitu beton ringan, bata merah, dan batako, dianalisis dengan variasi ketebalan 0,15 m, 0,20 m, dan 0,25 m. Suhu awal dinding diasumsikan seragam sebesar 25 °C, sementara permukaan luar ditetapkan pada suhu konstan sebesar 34 °C. Hasil simulasi menunjukkan bahwa panas merambat secara bertahap dari permukaan luar menuju bagian dalam dinding, dengan laju penetrasi yang dipengaruhi oleh sifat termofisika material dan ketebalan dinding. Batako menunjukkan respons termal yang lebih cepat dibandingkan bata merah dan beton ringan, sedangkan peningkatan ketebalan dinding secara konsisten memperlambat kenaikan suhu pada sisi dalam. Analisis nondimensi menggunakan Fourier number menegaskan bahwa seluruh sistem berada dalam rezim transien selama waktu simulasi, sehingga perbedaan respons termal yang diamati dapat dijelaskan sebagai konsekuensi langsung dari mekanisme difusi panas dan skala panjang karakteristik dinding.