This Author published in this journals
All Journal Nemui Nyimah
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Bantuan Teknis Desain Asrama Siswa Sekolah Alam Lampung Way Hui, Lampung Selatan Ifadianto, Nugroho; Sesunan, MM Hizbullah; Donna Jhonata; Basuki, Kelik Hendro; Adi, Nur
Nemui Nyimah Vol. 5 No. 1 (2025): Nemui Nyimah Vol. 5 No. 1 2025
Publisher : FT Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Senior High School is the final stage of formal education. In accordance with the vision and mission of Sekolah Alam Lampung, the learning process in this phase is also formed to prioritize the independent character of students. Independent character is not only carried out through learning activities at school but also in the environment where students live. The process of preparing students to be more independent in everyday life requires facilities in the form of dormitories that can support the process of non-formal education activities outside of study time. In addition to being a place to live while studying, dormitories can certainly accommodate non-formal learning activities along with an environment that can form independent characters in students. The planning of the dormitory with the provision of a suites system in 1 room (4 people with 2 bunk beds) and shared space for support in one building aims to bridge the process of interaction in community life for students. The male and female zones are in 1 building but there is a separation of zone access and activity circulation. The communal space in the form of a hall as an additional facility, remains under the management's supervision system and is bound by regulations. Shared space as a public facility, integrated into the residential zone aims to form the independence of residents. The community service activities will focus on architectural design starting with a location survey by summarizing the needs, desires, vision and mission of the Sekolah Alam Lampung foundation so that the predesign process can be carried out. Schematic design drawings will be used as discussion material with the foundation. In the final stage, drawings and design documents approved by the owner will be issued containing conceptual (3-dimensional) illustrations.