Yusuf, Siti Rahmawati
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Perhitungan Rencana Anggaran Biaya (Rab) Pada Jalan Tani Kelurahan Gurabati Yusuf, Siti Rahmawati; Muhammad, Amiruddin Hi.; Altarans, Indra
Jurnal Ilmiah Wahana Pendidikan Vol 11 No 12.A (2025): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study analyzes the Budget Plan (RAB) calculations for farm road construction in Gurabati Village by comparing flexible pavement and rigid pavement. The methods used include work volume calculations and unit price analysis (AHSP) using Microsoft Excel. The results indicate that the construction cost of flexible pavement is Rp 1,340,350,000, while that of rigid pavement is Rp 1,891,450,000. Based on the analysis of construction costs and long-term maintenance, flexible pavement is more economical to implement. This research can serve as a reference for efficient and tailored farm road construction planning.