Ahmad Syauki, Ilham
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

METODE PELAKSANAAN PEKERJAAN TANGGUL BIOGAS STUDI KASUS : PROJECT OF BIOGAS (COVERED LAGOON) TO FLARING MSL CARGILL Araska, Wahyu; Fernando, Rangga; Ahmad Syauki, Ilham
Jurnal Ilmiah Poli Rekayasa Vol 21, No 1 (2025): Oktober
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.21.1.412

Abstract

Soft soil work is a major challenge in berm construction due to the physical and mechanical characteristics of the soil. Soft soil generally has high moisture content, large porosity, and weak grain structure, which leads to very low soil bearing capacity. These conditions result in the soil being unable to support the construction load optimally, thus increasing the risk of settlement and lateral deformation. These factors create challenges in the planning and execution of earthworks, as specialized methods are required to improve the soil's stability and strength to ensure the berm functions safely and effectively. The proper working methods for handling soft soil can maintain the stability and safety of the embankment. These methods include replacing the original soil, stabilizing the soil using dolken piles and gradual mechanical compaction.The research results show that the success of berm construction is greatly influenced by thorough technical planning and coordination between work stages. This method has proven effective when applied to soft soil and provides constructive solutions to the technical problems that arise in the field.