Optimasi Desain Bottom Screen dan Sterilizer Pabrik Kelapa Sawit PT. XYZ Hery Sumardiyanto; Rahmat Rahmat; Sulaiman Sulaiman
Journal of Innovative and Creativity Vol. 5 No. 2 (2025)
Publisher : Fakultas Ilmu Pendidikan Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/joecy.v5i2.3448

Abstract

The bottom screen is the part responsible for removing ripe fresh fruit bunches (FFB) from the sterilizer. This role is crucial in ensuring the smooth flow of ripe fruit out of the sterilizer without any obstacles. If the bottom screen is disturbed, the flow of fruit out will be hindered, which ultimately reduces the sterilizer's capacity. A deformed or blocked bottom screen can inhibit the release of ripe FFB. Therefore, a deeper identification of the problem is needed to design the right solution to increase the capacity and effectiveness of the sterilizer. If the bottom screen is disturbed, the flow of fruit out will be hindered, which ultimately reduces the sterilizer's capacity. Therefore, regular repair and maintenance of the bottom screen are crucial to ensure that the sterilizer process runs smoothly and production capacity remains optimal. it can be concluded that the two main problems that have the greatest impact are the blockage of FFB out due to deformation of the bottom screen (41%) and thinning of the sterilizer wall (24%), which cumulatively. fixing these two problems is a top priority in efforts to increase sterilizer capacity.
Project control using S Curve in provision of pedestal crane at PT. Medco E&P Natuna - West Belut Platform Rahmat Rahmat; Dean Anggara Putra; Rifo Nurlaksana Restu; Jefri Imron; Marhaendra Natawibawa; Hery Sumardiyanto; Khairil Munawar; Thomas Junaedi
Priviet Social Sciences Journal Vol. 5 No. 8 (2025): August 2025
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v5i8.489

Abstract

In the implementation of a project, three main aspects are indicators of the success of the project: cost, schedule, and quality. If the cost and time of project implementation are in accordance with the planning and quality requirements, then the project can be said to be successful. Time plays a significant role in construction management projects, where time is also a management function. With good and proper time control, obstacles to delays in project implementation can be avoided as much as possible. The purpose of this study was to determine the cause of the achievement or deviation of work between the realization in the field and the planned time schedule for the procurement of a pedestal crane unit for a new platform in the operational area of ​​ block-B-Natuna.