Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perencanaan Daya Tampung Bendungan Budong - Budong Kabupaten Mamuju Tengah Sabri, Mohammad Noer Akbar; Badrun, Burhanuddin; Yusuf , Andi Rumpang
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 1 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i1.4364

Abstract

Dam construction is very necessary for irrigation, raw water supply and flood control, the main requirement for its construction is its stability. If stability is not met, it will trigger dam safety problems such as leaks, seepage, landslides, erosion and cracks. So, it is necessary to plan capacity by measuring the elevation, area and volume of several layers by involving literature studies, determining data requirements, providing administrative requirements, data collection from related agencies, and site surveys as an illustration of field conditions. The data is processed to obtain cumulative volume and presented in a table. Analysis of the water capacity of the Budong- budong dam in Central Mamuju Regency, West Sulawesi Province, is important in planning and managing water resources. The results of this research indicate that the Budong - Budong dam was built with a storage capacity of 57,284,568 m3 at an elevation of 70+. The dam was built using a type of rock fill dam with a clay core, due to the availability of sufficient rock material around the dam location.
Analisis Ketersediaan Dan Kebutuhan Air Baku Kab. Bantaeng : Studi Kasus: Bendungan Karatuang, Kab. Bantaeng, Sulawesi Selatan Yusriyani, Sri; Yusuf , Andi Rumpang; Syahrir, Suryani
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 1 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i1.4580

Abstract

Dams are built to hold and accommodate water and function as water catchers and to store them in the rainy season when river water flows in large quantities and exceeds requirements for irrigation, drinking water or industrial purposes. The Karatuang Dam, which is located in Bantaeng Regency, was built in the Calendu river basin, which has problems related to meeting the needs and availability of raw water. Bantaeng Regency often experiences drought during the dry season, which results in the land becoming very dry. So it is necessary to know how much the total raw water demand, water availability and reservoir capacity will be until 2042. It is necessary to research the population using arithmetic and geometric methods to find out how much increase will occur over the next 20 years. So it can be ascertained how large the population will be served until 2042 in Bantaeng Regency. It is necessary to research the annual maximum rainfall using several rainfall stations in this research to help determine adequate water needs. As well as, analyzing the frequency of rainfall using various methods including the gumbel distribution method, normal distribution method, log normal distribution method, Log Pearson Type III distribution method.