Athiah Safari
Program Studi Teknik Sipil, Universitas Pendidikan Muhammadiyah, Sorong, Papua Barat Daya, Indonesia

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

IDENTIFIKASI INDIKATOR KINERJA UNTUK MENGUKUR KEBERHASILAN PADA PROYEK KONSTRUKSI JALAN BETON BERDASARKAN PERSPEKTIF PENYEDIA JASA KONSTRUKSI Safari, Athiah; Solikin, Mochamad; Sunarjono, Sri; Handayani, Fajar Sri; Harnaeni, Senja Rum
Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil Vol. 29 No. 1 (2024): Wahana Teknik Sipil
Publisher : Politeknik Negeri Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32497/wahanats.v29i1.5648

Abstract

One of the infrastructures that society absolutely needs is roads. With the existence of roads, land transportation activities are carried out so that economic and social mobility runs normally. Concrete is one of the materials commonly used for road pavements, where this material technology has many advantages such as being able to withstand heavy vehicle loads and lower maintenance costs. To produce quality concrete roads, the role of the manager who leads the concrete road construction project is very decisive. To produce a quality concrete road, a manager must be able to determine indicators that influence its success, so that construction activities run effectively and efficiently. This study aims to identify Key Performance Indicators (KPIs) that can be used as a measure of success in concrete road construction projects based on the perspective of construction service providers. The analytical method used in this study is the Relative Importance Index to determine performance indicators that can be used as KPIs based on their relationship to success in concrete road construction projects. The results of the analysis show that the performance indicators that can affect the success of a concrete road construction project based on the perspective of a construction service provider are cost, quality, time, productivity, and environment, each of which has a weight of 21.41%, 19.44%, 19.05%, 15.65%, 12, 86% and 11.59%.
Analisis perencanaan sistem jaringan pipa (plumbing) dan sistem reservoar air bersih pada bangunan gedung Rian Hidayat; Athiah Safari; Elfiyusriningsih Syara
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 14 No. 2 (2025)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.14.2.10980.250-259

Abstract

The PKU Muhammadiyah UNIMUDA Sorong Hospital, located in Sorong Regency, West Papua, is currently in its initial phase of construction. This study aims to analyze the clean water demand, design the water distribution (plumbing) system, and estimate the construction costs of the plumbing and reservoir systems for the hospital's main building. The research method used is descriptive quantitative, utilizing primary data from field observations and secondary data such as architectural plans and technical standards. The water demand calculation is based on the Unit Plumbing Fixture Load (UPFL) method, referring to the Indonesian National Standard (SNI) 8153:2015. The results indicate that the water distribution system is designed by considering the reservoir capacity, pipe dimensions, minimum water pressure, and flow efficiency to support the hospital's operational needs sustainably. Cost estimation is presented in the form of a Bill of Quantities (BoQ), covering key components such as piping, pumps, and plumbing accessories. This research contributes as a technical reference for planning clean water systems in multi-story healthcare facilities and supports efficient and sustainable water management efforts in the West Papua region.
Analisis faktor penyebab keterlambatan proyek pembangunan gedung berdasarkan perspektif penyedia jasa konstruksi pada Proyek Pembangunan RS PKU Muhammadiyah UNIMUDA Sorong Alysia Wahyu Amalya; Athiah Safari; Intan Java Turis Repmi Tamsih
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 15 No. 1 (2026)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.15.1.15146.146-158

Abstract

Delay is one of the most common problems in construction projects and can lead to cost overruns, reduced work quality, and failure to meet the planned project completion schedule. This study aims to identify the factors causing delays and determine the most dominant factor affecting the Construction Project of PKU Muhammadiyah UNIMUDA Sorong Hospital. A descriptive quantitative method was employed, with data collected through questionnaires distributed to experts and professional employees from the contractor and consultant teams involved in the project. Out of a population of 40 individuals, 33 respondents met the criteria for analysis. The data were tested using the Kaiser-Meyer-Olkin (KMO) and Bartlett’s Test of Sphericity for validity, as well as Cronbach’s Alpha for reliability, and were subsequently analyzed using the Relative Importance Index (RII) method. The results identified nine factors with 31 valid and reliable criteria influencing construction project delays. Environmental/weather factors were found to be the most dominant, with an Adjusted RII value of 87.63%, followed by labor factors at 83.08% and material factors at 81.82%. These findings indicate that environmental and weather conditions pose the greatest risk to achieving project schedule targets, particularly because weather conditions and site characteristics can hinder resource mobilization and fieldwork activities. This study provides empirical evidence showing that environmental/weather factors are the most dominant cause of delays in building construction projects in the Southwest Papua region and can serve as a basis for developing delay risk mitigation strategies for projects with similar characteristics.