PROGRAM EXCELLENCE SOLUTION UNTUK MENURUNKAN WAKTU PENGERJAAN REMANUFACTURING UNIT KOMATSU PC2000-8 DI PT UT SITE KALIMANTAN SELATAN

Vuko A.T. Manurung (Unknown)
Lukyawan Pama Deprian (Unknown)
Yohanes Tri Joko Wibowo (Unknown)



Article Info

Publish Date
24 Oct 2019

Abstract

With the passage of time the heavy equipment unit will experience a decrease. In order to return the unit to its initial performance, the Reman manufacturing process is abbreviated as Reman. Reman is an activity carried out to keep heavy equipment units close to performance when first created.PT UT site Adaro is trusted by its customers to do Reman specifically for Komatsu PC 2000-8 type excavators. In the implementation there was a delay in the implementation of the work process to 80 days. Therefore, a program was created to reduce the total leadtime to 45 days or down by 44%.

Copyrights © 2019






Journal Info

Abbrev

JMEM

Publisher

Subject

Energy Materials Science & Nanotechnology Mechanical Engineering Transportation

Description

Journal of Mechanical Engineering and Mechatronics merupakan jurnal keilmuan bidang teknik mesin dan mechatronics yang memuat tulisan-tulisan ilmiah mengenai penelitian-penelitian murni dan terapan serta ulasan-ulasan umum tentang perkembangan teori, metode dan ilmu-ilmu terapan ...