Jurnal Infrastruktur
Vol 4 No 1 (2018): Jurnal Infrastruktur

PERENCANAAN METODE PELAKSANAAN DAN RENCANA ANGGARAN BIAYA REKONSTRUKSI JPO PASAR MINGGU

Naomi Oktriani Br Damanik (PT. Grid Solution Indonesia)
Kusno Adi Sambowo (Universitas Negeri Jakarta)



Article Info

Publish Date
29 Jul 2019

Abstract

The crossing bridge at Pasar Minggu is the link between the train station and the shopping center opposite. The reconstruction of the collapsed bridge starts with problem identification and research, then chooses the most appropriate method to use in the reconstruction process, and calculates the cost for the reconstruction of the bridge. From the research results it can be seen that the bridge is reconstructed by retrofitting method where the existing bridge structure is reinforced by the method of scaffolding and launching, so that the bridge is again become feasible to be used, and the cost required to reconstruct the bridge is Rp 1.213.239.230.

Copyrights © 2018






Journal Info

Abbrev

infrastruktur

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Jurnal Infrastruktur merupakan jurnal yang dikelola oleh Program Studi Teknik Sipil Universitas Pancasila dengan nomor ISSN 2476-9339 dan E-ISSN 2540-9212 Jurnal Infrastruktur diterbitkan secara berkala 2 (dua) kali dalam 1 (satu) tahun, yaitu pada bulan April dan Oktober. Fokus dan ruang lingkup ...