PENJADWALAN PROYEK DENGAN PRECEDENCE DIAGRAM METHOD (PDM) DAN RANKED POSITION WEIGHT METHOD (RPWM)

I Gusti Ngurah Oka Suputra (Unknown)



Article Info

Publish Date
26 Nov 2012

Abstract

In project construction world, many models of project planning havebeen intensively used, such as a Precedence Diagram Method (PDM). Schedulingon PDM considers dependency between activity and duration of each activity. Todeal with the limited resources, hence allocation and resources levelling need to beimplemented using Resource Scheduling Method. Activity scheduling priority isbased on activities with the minimum floating time. If some activities have thesame floating time, a problem arises in determining the priority of schedulingactivity. In the Ranked Position Weight Method (RPWM), allocation and resourceslevelling are based on positional weight of each activity. Positional weight isdetermined by adding the sum of duration of an activity with the sum of a totalduration of all following activities. The value of positional weight of an activityshows a degree of its importance in relation to other activities. The effects of theconstruction work condition on the project activity should be considered whenpreparing precedence logic (relationship of interdependency activities).

Copyrights © 2011






Journal Info

Abbrev

jits

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Ilmiah Teknik Sipil (p-ISSN: 1411-1292; e-ISSN: 2541-5484) is an online periodical journal of science that is published twice a year, in January and July by Civil Engineering Department, Faculty of Engineering, Udayana University. Jurnal Ilmiah Teknik Sipil is a media to publish the results ...